One point of contact
From the first call to the handover, the same project manager is responsible for you.
- You do not have to coordinate the trades.

More than 20 years of professional background, our own team, one point of contact. Apartment renovation, house renovation and house building – with brick, YTONG and SIP panel technology.
M&M TeleHome Kft. provides dependable solutions for private individuals and businesses, from apartment renovations to full general contracting.
Our aim is to deliver every project to a high technical standard, on transparent terms and within the agreed deadlines. Every job starts with an on-site survey and a detailed, itemised cost estimate. The work is carried out by our own well-coordinated team, and we stay in touch with you throughout.
From 2026, alongside traditional construction, we also build turnkey family homes with certified MgO graphite SIP panel technology – with a Hungarian manufacturing partner, almost nationwide.
From the first call to the handover, the same project manager is responsible for you.
Every type of work and every material listed item by item.
We work to a schedule; the deadline is set out in the contract and we keep to it.
We give a warranty on all our work.
A small, well-practised team – not casual subcontractors. The same people on every project; your first enquiry is handled by the managing director.
Needs assessment, consultation, quotation, contract.
+36 30 366 0936Mon–Fri 8:00–18:00 · info@telehome.huSurvey, itemised cost estimate, technical specification, permits.
+36 30 711 8772Scheduling, coordinating the trades, daily contact on site.
+36 30 483 9385The certificate confirms that no justified consumer complaint was received against the company in the period examined – with the highest, AAA trust rating. For us this is not a goal but a consequence: the result of transparent cost estimates and deadlines that are kept.
Our certificates for both years can be viewed and downloaded.

The company works with 20+ years of professional background and 150+ completed projects; its main profile is full apartment and house renovation in Budapest and Pest County, as general contracting, as well as turnkey brick/YTONG house building within 50 km of Budapest and certified MgO SIP panel house building almost nationwide. Every job starts with a personal on-site survey and an itemised cost estimate, with one point of contact through to handover.
One project manager, who stays the same from the on-site survey to handover: they prepare and keep the schedule, coordinate the trades and respond to the comments you write on the client portal. The technical estimator is available during the quotation and contract phase, and the managing director throughout the entire collaboration – all three phone numbers are in the footer, on weekdays between 8 am and 6 pm.
Yes. We hold contractor's liability insurance for damage caused during construction, which is a legal requirement for house building and important in apartment renovations to protect the neighbours and the apartment building. On top of this we provide a contractual warranty on all our work, and we have held the Complaint-Free Construction Certificate (AAA) since 2025.
Yes. For house building and extensions, the permit and construction drawings, the structural and the energy design are prepared with our partner architects; in renovations we also cooperate with the client's own interior designer or interior architect, and we price the plans and renderings item by item. In our Premium packages, an interior architect consultation is part of the service.
Three commitments that we write into every contract: the itemised cost estimate is part of the contract, so there are no price increases afterwards; a fixed deadline according to the schedule; one responsible party, one contractual warranty. Added to this are our in-house-developed client portal, where you follow the work in real time, our well-established own team, and honest advice – even when it does not point towards the bigger job (for example demolition instead of renovation, or one good tradesman instead of general contracting).
Itemised cost estimate, fixed price, fixed deadline, contractual warranty – we reply within 1 working day.