Home Renovation
Renovation – overviewApartment renovationHouse renovationShop, office, restaurant
House building
House building – overviewBrick / YTONG houseSIP panel house
References About Blog Client portal Request a quote +36 30 366 0936

info@telehome.hu · 20+ years of professional background

General contracting · Budapest and surroundings

Apartment renovation and house building you can rely on for decadesget at a fixed pricehave backed by a warrantybe proud of

Turnkey apartment renovation and house building under one contract – with an itemised cost estimate, a fixed price and a warranty set out in the contract.

Free capacity: usually within 2 months

Why TeleHome?

Quality, expertise, warranty – with a single point of contact

We carry out the entire project as general contractor, fully coordinated. One contact person, one party responsible, one contract. You always know exactly what is happening and what it costs.

Itemised, transparent cost estimate

After the survey we prepare an itemised, detailed cost estimate with no hidden costs. You see exactly what you are spending on what – and it becomes part of the contract.

Fixed deadline, in the contract

We work to a schedule. The deadlines we commit to are written into the contract and kept – measured in weeks for apartment renovations and in months for house building.

Warranty on every job

Every job we do comes with a warranty. We hold a Complaint-Free Construction Certificate (AAA rating) and work with verifiable references.

Process

How the work proceeds, in 5 steps

From the first call to handing over the keys, every step is planned in advance and transparent.

1

Getting in touch

By e-mail, by phone or via the quote request form.

2

On-site survey

Condition survey and professional advice on site.

3

Cost estimate

Preparation of an itemised, detailed quotation.

4

Contract

With a fixed deadline and a fixed specification.

5

Construction

Coordinated team, continuous communication, handover.

References

Apartment and house renovation

Renovation of panel, brick and period apartments and family houses

View all
Bathroom with green wall, double basin and brass fittingsRenovated room with pendant lamps and concealed lightingBathroom with green herringbone tiles and freestanding bathBathroom with wooden counter, round mirror and pendant lampsRenovated living room with concealed LED lighting and ring lampsRenovated kitchen with herringbone-pattern floor1 / 6

House building

Turnkey brick / YTONG and SIP panel family houses

View all
Finished brick family house with flat roof and round windowsTwo-storey family house under construction with pergolaFamily villa with travertine façade at structural completionFoundation slab after concreting, with formworkModern two-storey family house with garageTiled terrace next to the finished house1 / 6
How we work

Our 3 promises for every renovation and house build

The point of general contracting is that we carry the risk, not you. We write these three commitments into every contract – for renovations and house building alike.

1

The itemised cost estimate is part of the contract

After the survey you receive an itemised, detailed cost estimate, which becomes an annex to the contract.

  • We do not ask for more afterwards for anything included in the specification set out in the contract – only a change you request alters the price, and that too is agreed in advance, in writing.
2

Fixed deadline, to a schedule

The lead time we commit to – typically 4–16 weeks for an apartment renovation, 8–16 months for a brick/YTONG house, 4–6 months for a SIP panel house – is set out in the contract, and we work to a schedule.

  • One project manager is responsible for coordinating the trades, so the work does not stop because “the plumber didn't turn up”.
3

One party responsible, contractual warranty

One contract, one contact person, one warranty provider.

  • If there is a problem in any trade, you do not have to find out who is at fault – we fix it.
  • Our Complaint-Free Construction Certificate (AAA) shows that we have been working this way for a long time.

Being honest about the survey fee: the on-site condition survey costs HUF 20,000 + VAT in Budapest and HUF 30,000 + VAT within 20 km outside the city, which we credit back in full if you accept our quote – so in the end the survey is free for you.

  • We charge it because at the survey you receive real professional advice, and an itemised cost estimate is prepared from it – not a “from–to” guess over the phone.
  • If you go ahead with us on the basis of our quote, the fee is deducted from the first invoice; if not, the survey and the cost estimate are still yours to keep.
  • What we look at on site and what the cost estimate contains: condition survey and cost estimate.
Our servicesRenovation and house building – one contractor
  • Apartment renovationPartial or full renovation, under one contract.
  • House renovationRoof, façade, building services, energy upgrade.
  • Office and shop renovationRetail unit, office, restaurant – work carried out to a schedule.
  • House building – traditional technologyBrick / YTONG masonry, cast-in-place slab, turnkey.
  • SIP panel house buildingFast, energy-saving construction, in as little as 4–6 months.
Outstanding20+ years of professional background
About us

M&M TeleHome – your partner for high-quality construction

M&M TeleHome Kft. provides reliable solutions for private individuals and businesses, from apartment renovations to full general contracting.

Every project starts with an on-site survey and a detailed, itemised cost estimate. The work is carried out by our own coordinated team, with continuous communication – so our clients know exactly what to expect throughout the whole process.

  • Our own, well-practised team – not casual subcontractors
  • One contact person from the first call to handover
  • Complaint-Free Construction Certificate (AAA)
  • Real, verifiable references
House building

Two technologies – one contractor

We do not believe that a single technology suits everyone. That is why we apply both to a high standard, and tell you honestly when each one is worth it. We offer an online price calculator for both building methods – plan and browse without any obligation.

Traditional

Brick / YTONG masonry

The most widespread, proven building method in Hungary. Clay block (Porotherm) or aerated concrete (YTONG) walls, cast-in-place or precast floor slabs, insulated façade. Long service life, excellent thermal mass, a wide choice of materials.

Turnkey lead time8–16 months
Net pricefrom HUF 650,000/m²
Energy ratingA – A+
Fast and energy-efficient

SIP panel house

MgO-faced structural panels with a graphite EPS core, ÉMI/EOTA certified, from a Hungarian manufacturer. Passive-house-level insulation (U ≤ 0.11 W/m²K), A++ energy class, 25-year system warranty, turnkey in as little as 4–6 months.

Turnkey lead time4–6 months
Net pricefrom HUF 500,000/m²
Energy ratingA++
Reviews

What our clients say

★★★★★

“We commissioned TeleHome with a full apartment renovation. Thanks to their well-prepared professionals and fair cooperation, the renovation was completed on time and to a high standard. Thank you.”

CsabaGoogle review
★★★★★

“Detailed quote, accurate settlement, punctual start and finish. Good client relations, good-quality work, realistic price.”

GergelyGoogle review
★★★★★

“We renovated an apartment. From the start to the very last nail it turned out first-rate. The whole team worked punctually and neatly, the tradesmen were real experts.”

BenedekGoogle review
★★★★★

“We asked the TeleHome team for an almost complete renovation of our rather run-down small apartment: new electrical system, replacement of windows and doors, flooring – everything was done properly and on time.”

LeventeGoogle review
★★★★★

“I am completely satisfied with the M&M TeleHome team and warmly recommend them. We have worked together several times on a full apartment renovation.”

ViktóriaGoogle review
★★★★★

“Precise, flexible, modern. Everything went as agreed. I can recommend them without hesitation.”

TamásGoogle review
★★★★★

“A few years ago they carried out a full renovation of our Budapest apartment. It was very positive that the contractor kept everything under control and the whole process went smoothly.”

PéterGoogle review
★★★★★

“We are satisfied.”

MihályGoogle review
★★★★★

“Five stars – everything was in order, I recommend them.”

KrisztiánGoogle review
Blog

Useful things to know about renovation and building

Technology, costs, permits and experience – everything that helps you find your way before a renovation or a house build.

Apartment Modernization: Windows, Heating, Hot Water and Insulation
Renovation

Apartment Modernization: Windows, Heating, Hot Water and Insulation

Modernizing an apartment starts where painting ends: windows, heating, hot water and insulation. These decide your utility bills and how the home actually feels.

Read more →
Bathroom Renovation Step by Step: From Demolition to Painting
Bathroom & interior

Bathroom Renovation Step by Step: From Demolition to Painting

The bathroom is the densest room of any home: water, electricity, humidity and tiling meet on a few square metres. Its renovation tolerates no improvisation – from demolition to painting, every step works for the next one.

Read more →
Partial Apartment Renovation: What It Includes and the Right Order of Work
Renovation

Partial Apartment Renovation: What It Includes and the Right Order of Work

Not every apartment needs a full renovation. If the plumbing and wiring are in good shape, a well-planned partial renovation – new flooring, interior doors, fresh paint, new fixtures, even a complete bathroom – can give you…

Read more →
Facade Insulation on a Family House: System, Thickness, Pitfalls
House renovation

Facade Insulation on a Family House: System, Thickness, Pitfalls

Facade insulation is the best-paying part of a family-house renovation – but only if it is built as a system: from matching materials, thick enough, thought through from the plinth to the eaves.

Read more →
Heat Pump Heating in Houses and Flats: Types, Planning, Installation
House building

Heat Pump Heating in Houses and Flats: Types, Planning, Installation

The heat pump is today the first choice both for modernising the heating of family houses and for new builds – but it only works well as a properly sized system: with output matched to the building, suitable heat emitters…

Read more →
Replacing exterior windows and doors: from removal to sills
House renovation

Replacing exterior windows and doors: from removal to sills

Replacing a window takes half a day – and yet it decides the comfort of a home for decades.

Read more →
House Renovation in and around Budapest: A Complete Guide from Modernisation to Painting
House renovation

House Renovation in and around Budapest: A Complete Guide from Modernisation to Painting

A house renovation is not one job but eight to ten interlocking trades: roof, walls, water, electrics, heating, insulation, windows and doors, solar, tiling and painting. Taken one by one, each is simple.

Read more →
Wekerle Plusz energy renovation grant: up to HUF 7.5 million – what we know so far
Costs and prices

Wekerle Plusz energy renovation grant: up to HUF 7.5 million – what we know so far

Up to HUF 7.5 million in non-repayable grant and a preferential loan at 3% will be available for energy renovation.

Read more →
Full or Partial Apartment Renovation? When Each One Pays Off
Apartment renovation

Full or Partial Apartment Renovation? When Each One Pays Off

Just the bathroom, or the whole flat? A partial renovation looks cheaper. Sometimes it is; sometimes you pay twice for the same thing. We show you where the line is.

Read more →
House Renovation Costs 2026: What They Depend On and Where to Save Wisely
Costs and prices

House Renovation Costs 2026: What They Depend On and Where to Save Wisely

"How much does it cost to renovate the house?" There is no honest number for that over the phone. What can be said precisely is what the price depends on, what takes the larger part of the budget, and where you can save without paying twice.

Read more →
Construction Industry 2026: Prices, Demand and Outlook for 2027
Costs and prices

Construction Industry 2026: Prices, Demand and Outlook for 2027

Falling output, rising prices, uncertain subsidies: the construction industry looks contradictory in autumn 2026. We have gathered the latest figures and translate what they mean for anyone planning to renovate or build in 2027.

Read more →
Kitchen Renovation: From Planning to Installation
Apartment renovation

Kitchen Renovation: From Planning to Installation

The kitchen is the most used room in a flat and the one that needs the most trades: electrics, water, drainage, ventilation, tiling, joinery, all in one square metre. That is why it is where most renovations go wrong.

Read more →
FAQ

Frequently asked questions

How much does an apartment renovation cost in Budapest in 2026?

The price of a full apartment renovation depends on the scope of work; we give you the exact figure after an on-site survey, in an itemised, detailed cost estimate. The survey fee is HUF 20,000 + VAT in Budapest and HUF 30,000 + VAT within 20 km outside the city, which we credit back if you accept our quote.

How much does house building cost with TeleHome?

We build turnkey family homes with traditional (brick/YTONG) technology from net HUF 650,000/m², and with SIP panel technology from net HUF 500,000/m², with a fixed specification. The price is refined on the basis of the plans and the package you choose.

What is the difference between a brick house and a SIP panel house?

A brick/YTONG house is traditional masonry construction: long service life, high thermal mass, an 8–16 month build. A SIP panel house is built from prefabricated, MgO-faced panels with a graphite EPS core: passive-house-level insulation (U ≤ 0.11 W/m²K) and a turnkey build in 4–6 months. You will find a detailed comparison on the house building page.

Where does TeleHome work?

We carry out apartment renovations in Budapest and Pest County, house building within a 50 km radius of Budapest, and SIP panel house building almost nationwide.

Do you give a warranty on your work?

Yes. Every job comes with a warranty set out in the contract, and we hold a Complaint-Free Construction Certificate (AAA trust rating).

When can you start, and how long is the waiting time for a renovation or a house build?

We usually have free capacity within 2 months, but the exact start date is fixed in the schedule after the on-site survey and the signing of the contract. For an apartment renovation, 2–6 weeks typically pass between the survey and the start (cost estimate, ordering materials, coordination with the apartment building), while for a house build the design and permitting take 2–4 weeks with a simple notification and 2–4 months with a building permit. If you need to meet a specific deadline – a move, a loan disbursement – let us know when you request a quote, and we will plan the schedule around it.

What does it mean that you work as a general contractor, and why is that better than hiring separate tradesmen?

As a general contractor, a single company – M&M TeleHome Kft. – is responsible for the entire job: demolition, mechanical and plumbing work, electrical work, plasterboarding, tiling, painting and every other trade under one contract, with one project manager and one party providing the guarantee. You do not have to coordinate five or six contractors, and if something goes wrong, the tradesmen do not point fingers at each other – we fix it. In Budapest and Pest County we offer general contracting for apartment renovations, family house renovations and turnkey house builds alike. Details: general contracting.

How can I follow the construction if I cannot visit the site every day?

Every client with a signed contract gets access to our in-house client portal. There you can see the photo documentation of each work phase in real time, from demolition to the finished state, with the contract, the itemised cost estimate and the payment schedule all in one place, and you can submit your comments in writing, in a traceable way. You receive an e-mail about every change, and after the project is closed the complete documentation can be downloaded – you do not have to phone us to find out how your apartment renovation or house build is progressing.

Do you take on partial renovations, or only full apartment renovations?

Yes, we take on partial renovations too – for example a bathroom renovation, a kitchen renovation, a complete rewiring or the replacement of windows and doors – provided that at least two or three trades build on each other. Where only a single trade is involved (just painting, just replacing one door), we will tell you honestly that a good tradesman is often enough. General contracting delivers the most value on full apartment and house renovations, because the sequence, the scheduling and the guarantee are all in one pair of hands.

What happens after I request a quote – what can I expect in the first week?

After you fill in the quote request form, send an e-mail or call us, we call you back within 1 working day and arrange an appointment for an on-site survey. At the survey you receive a condition assessment and professional advice, and on that basis we prepare the itemised, detailed cost estimate, which becomes an annex to the contract with a fixed deadline and a guarantee. The survey fee is HUF 20,000 + VAT in Budapest and HUF 30,000 + VAT within a 20 km radius, and we credit it in full if you accept our quote. For house builds, the consultation is free of charge.

Request a quote

Ask for a no-obligation quote

On-site survey, itemised cost estimate, fixed price and deadline – we call you back within 1 working day.

  • Reply within 1 business day
  • Itemised cost estimate
  • Fixed price, fixed deadline, warranty
No obligationMon–Fri 8:00–18:00 · info@telehome.hu
Service area

Where do we take on apartment renovation and house building?

We carry out apartment and house renovations in every district of Budapest and in certain towns and villages of Pest County. We build brick/YTONG houses within roughly a 50 km radius of Budapest, and SIP panel houses almost nationwide – because the panels are prefabricated, distance is not a primary consideration here.

Budapest – all 23 districts

  • I. Budavár
  • II. Rózsadomb, Pasarét
  • III. Óbuda, Békásmegyer
  • IV. Újpest
  • V. Belváros, Lipótváros
  • VI. Terézváros
  • VII. Erzsébetváros
  • VIII. Józsefváros
  • IX. Ferencváros
  • X. Kőbánya
  • XI. Újbuda
  • XII. Hegyvidék
  • XIII. Angyalföld, Újlipótváros
  • XIV. Zugló
  • XV. Rákospalota
  • XVI. Mátyásföld
  • XVII. Rákosmente
  • XVIII. Pestszentlőrinc
  • XIX. Kispest
  • XX. Pesterzsébet
  • XXI. Csepel
  • XXII. Budafok
  • XXIII. Soroksár

Pest County and the Budapest commuter belt

  • Érd
  • Budaörs
  • Törökbálint
  • Diósd
  • Solymár
  • Pilisvörösvár
  • Budakeszi
  • Szentendre
  • Pomáz
  • Budakalász
  • Dunakeszi
  • Fót
  • Göd
  • Vác
  • Veresegyház
  • Gödöllő
  • Kistarcsa
  • Pécel
  • Vecsés
  • Gyál
  • Dunaharaszti
  • Szigetszentmiklós
  • Százhalombatta
  • Monor
Can't find your town or village? Feel free to ask – the list is not complete; we also work in other parts of Pest County and in some parts of the Lake Balaton area. Take a look at our references.