Office
Space planning with drywall partitions and glass walls, suspended ceilings with LED lighting, structured cabling, air conditioning, acoustics, carpet or vinyl flooring, kitchenette, washrooms.

Fit-out and renovation of shops, offices, restaurants and clinics from one contractor. Every day spent closed costs money – which is why the deadline is a contractual item with us.
Space planning with drywall partitions and glass walls, suspended ceilings with LED lighting, structured cabling, air conditioning, acoustics, carpet or vinyl flooring, kitchenette, washrooms.
Shopfront and display window, branded finishes and painting, lighting design, stockroom and fitting room, alarm and cameras, accessible entrance.
HACCP-compliant kitchen and storage, grease trap, extraction and ventilation, gas fitting, non-slip flooring, interior design of the guest area, toilets and washrooms.
Hygienic, easy-to-clean surfaces, service connections for medical equipment, waiting area, spaces with special sound and lighting needs (hairdresser, beauty salon, fitness, photo studio).
Renovation of stairwells, entrance passages, façades, roofs and service risers for residents' associations – aligned with the resolution of the general meeting.
Fast, durable, easy-to-maintain renovation for letting – planned to a fixed budget and for return on investment.

Yes. For shops and restaurants we often work out of hours, at night or in phases, so that the loss of trade is minimal. We fit the schedule to your opening hours and fix it in the contract.
A full renovation of a 100–200 m² office or shop typically takes 3–6 weeks; a restaurant kitchen with plumbing, heating and ventilation 6–10 weeks.
Of course. We work with a contractor agreement, an itemised, detailed cost estimate, a VAT invoice and a guarantee fixed in the contract.
Yes. We take the requirements into account from the design stage, and we hand over the necessary documentation.
The price depends on the technical specification: there is a several-fold difference between a cosmetic refresh (painting, carpet or vinyl flooring, lighting, fittings) and a complete fit-out (plasterboard partitioning, structured cabling, air conditioning, acoustics, kitchenette, toilets); in a restaurant, the HACCP-compliant kitchen, the grease trap and the extraction take up most of the budget. That is why, after an on-site survey, we provide an itemised, detailed cost estimate in which materials and labour appear on separate lines – with a VAT invoice, transparent for the landlord and the accountants alike.
In leased premises, the landlord's written consent is required for work affecting the structure, the façade, the shopfront and the mechanical risers, and the lease often stipulates what stays in the premises when you move out. We put together the itemised cost estimate so that the items that can be settled with the landlord (value-adding items) are shown separately, and the removable branding elements are kept apart. We also handle the notifications to the apartment building and the local authority, as well as the townscape consultation for the shopfront replacement.
Yes. For an apartment intended for letting, the goal is a quick, durable and easy-to-maintain renovation: hard-wearing vinyl or SPC flooring, washable paint, easy-to-clean surfaces, heavy-duty fittings, and a fixed budget so that the return on the investment can be planned. We align the schedule with the letting period so that the apartment stays empty for as short a time as possible. For a portfolio of several apartments we work under a framework agreement with a uniform technical specification.
Yes, for apartment building communities and building managers we renovate stairwells, entrance halls, façades, roofs and mechanical risers. We tailor the quote to the resolution of the general meeting and the renovation fund, and the itemised cost estimate can also be used for grant applications and apartment building loans. We schedule the work so that the residents notice it as little as possible – keeping the stairwell passable, dust protection and daily cleaning are part of the contract.
On a commercial renovation the deadline is a contractual item: we fix the handover to the calendar day and, on request, we undertake a penalty for delay, because we know that every day spent closed is lost revenue. The only accepted reasons for a delay are a change requested by the client or an official procedure – and we document these in writing. One project manager keeps to the schedule, we report weekly, and you can follow progress in real time on the client portal.
On-site survey, itemised quotation and a schedule fitted to your opening hours, with a fixed deadline.