Home Renovation
Renovation – overviewApartment renovationHouse renovationShop, office, restaurant
House building
House building – overviewBrick / YTONG houseSIP panel house
References About Blog Client portal Request a quote +36 30 366 0936

info@telehome.hu · 20+ years of professional background

Modern kitchen after a TeleHome renovation
References

References – apartment renovation and house building in Budapest

The best proof of our work is our satisfied clients and the projects we have completed. There is a real client behind every one of our projects.

Featured projects

How we work – three projects up close

Budapest, Lövölde tér, full apartment renovation
Apartment renovation

Budapest, Lövölde tér – full renovation of a period apartment

We renovated this classic period apartment in full, from the demolition works to the turnkey handover. Completely new plumbing, heating and electrical systems, an electricity meter upgraded to the current standard, a new flue for a condensing gas boiler and modern radiator heating.

The old windows were replaced with triple-glazed uPVC windows, white inside and out, with electric shading. A new plasterboard suspended ceiling prepared for concealed LED lighting, a new floor build-up, tiling and flooring, painting and internal doors – handed over ready to move into.

Érd, construction of a turnkey family house
Brick house building

Érd – turnkey, two-storey family house

Full turnkey construction of a two-storey family house of more than 200 m². 30 cm Porotherm masonry with 10 cm graphite façade insulation, reinforced concrete floor slabs and a flat roof. Complete building services with a heat-pump heating and cooling system, prepared for solar panels and an electric car charger.

The building takes its character from steel pergolas, decorative beams and the projecting "brim" that runs around the roof line with integrated LED lighting. Foundations adapted to the rocky ground and a soakaway system built to local regulations were also part of the job.

Solymár, partial apartment renovation – bathroom with gold mirrors
Partial renovation

Solymár – partial renovation of an apartment

We remodelled the home of a young married couple: the aim was a more modern, brighter and more functional living space. The core of the existing heating system and the external windows and doors were kept, yet the interior of the property was renewed almost completely, with modern technical solutions and premium materials.

We fully modernised the electrical installation, fitted new internal doors, and refinished every wall and ceiling surface. The bathroom and the other wet rooms were renovated in full, and new flooring and air conditioning were installed as well. The most striking feature of the apartment is the bespoke plasterboard suspended ceiling with concealed LED lighting – a clean-lined, lasting home that suits the owners' long-term needs.

Gallery

Apartment renovation references

12 / 145
Gallery

House building references – brick / YTONG

12 / 75
Gallery

SIP panel houses

12 / 25
Reviews

What our clients say

★★★★★

“We commissioned TeleHome with a full apartment renovation. Thanks to their well-prepared professionals and fair cooperation, the renovation was completed on time and to a high standard. Thank you.”

CsabaGoogle review
★★★★★

“Detailed quote, accurate settlement, punctual start and finish. Good client relations, good-quality work, realistic price.”

GergelyGoogle review
★★★★★

“We renovated an apartment. From the start to the very last nail it turned out first-rate. The whole team worked punctually and neatly, the tradesmen were real experts.”

BenedekGoogle review
★★★★★

“We asked the TeleHome team for an almost complete renovation of our rather run-down small apartment: new electrical system, replacement of windows and doors, flooring – everything was done properly and on time.”

LeventeGoogle review
★★★★★

“I am completely satisfied with the M&M TeleHome team and warmly recommend them. We have worked together several times on a full apartment renovation.”

ViktóriaGoogle review
★★★★★

“Precise, flexible, modern. Everything went as agreed. I can recommend them without hesitation.”

TamásGoogle review
★★★★★

“A few years ago they carried out a full renovation of our Budapest apartment. It was very positive that the contractor kept everything under control and the whole process went smoothly.”

PéterGoogle review
★★★★★

“We are satisfied.”

MihályGoogle review
★★★★★

“Five stars – everything was in order, I recommend them.”

KrisztiánGoogle review
FAQ

Frequently asked questions

Can I visit a completed project or one under construction in person?

Yes, by appointment. At our houses under construction (brick/YTONG within 50 km of Budapest, SIP houses in several parts of the country) you can see both the structural and the finishing phase; for handed-over apartments we arrange a visit or a telephone reference with the consent of our previous clients. For us, "verifiable" means we give you a name and contact details, not just a photo.

Do the references include only full renovations, or smaller jobs too?

Both: alongside the full renovation of the period apartment on Lövölde tér and the 200 m² turnkey house in Érd, there are partial jobs too – for example an electrical upgrade and a suspended ceiling with concealed LED lighting in Solymár. In the galleries you can filter separately for bathroom renovation, kitchen, living room, façade and SIP structural work, so you can find something similar to your own plan.

How long did the renovations shown take to complete?

Our apartment and house renovations were completed in 4–16 weeks from demolition to handover, depending on size and technical specification, and bathroom renovations in 2–4 weeks; brick/YTONG detached houses were turnkey-ready in 8–16 months and SIP panel houses in 4–6 months. For every reference project, the agreed deadline was fixed in the contract – this is one of the things worth asking our previous clients about.

Are the Google reviews genuine, and where can I read them?

Yes, the 5.0-star reviews can be read, with names, on TeleHome's public Google Business Profile, and we quote them on the homepage. In addition, our Complaint-Free Construction Certificate (AAA rating, a PDF downloadable from the footer) is independent confirmation that there are no registered consumer complaints against us. When choosing a contractor, it is worth looking at these three together – reviews, complaint-free status and personal references.

Will you produce photo documentation of my renovation too?

Yes, on every project: we photograph the concealed work (waterproofing, wiring, pipes, thermal-bridge sealing) before it is closed up, you can follow the work phases in real time on the client portal, and at handover the complete documentation can be downloaded. We only use the photos as references with your written consent, without address or name.

Request a quote

Let your home be our next reference

Every one of our references started with a survey – request a no-obligation quote.

  • Reply within 1 business day
  • Itemised cost estimate
  • Fixed price, fixed deadline, warranty
No obligationMon–Fri 8:00–18:00 · info@telehome.hu