Home Renovation
Renovation – overviewApartment renovationHouse renovationShop, office, restaurant
House building
House building – overviewBrick / YTONG houseSIP panel house
References About Blog Client portal Request a quote +36 30 366 0936

info@telehome.hu · 20+ years of professional background

Electrical Installation and Rewiring
Electrical Installation

Electrical installation you can rely on

Complete electrical solutions for apartments and family houses, from the incoming supply to the finishing details, for new builds and renovations alike.

Electrical Installation

Electrical work done properly

Modern electrical installation is much more than running cables and fitting switches. A well-designed electrical system is safe, easy to extend and serves the needs of your home for decades. TeleHome provides complete electrical services for apartments and family houses, from the fundamentals to the finishing touches, whether you are building new or renovating.

  • Full rewiring and new installations
  • Utility meter installations built to Hungarian grid operator standards
  • Sockets, switches and lighting, with wet-room safety rules observed
  • Alarm, low-voltage and smart home systems
  • Electrical safety testing with a certificate on handover
Electrical Installation and Rewiring | TeleHome
Outstanding20+ years of professional background
How we work

How it works

Every step is designed to protect the quality and durability of the finished result.

  1. 01

    An integrated approach

    We treat electrical work not as a stand-alone phase but as part of how the whole house functions. An outdated or badly designed electrical system is not just inconvenient; it can be a serious safety risk. TeleHome always starts from how the building is used, how it may be extended in future and its technical constraints, so the finished system meets your needs today and stays reliable for years.

  2. 02

    Meter installation

    Installing or upgrading the utility meter point is one of the most critical parts of any electrical job, especially for family houses, where compliance with standards and with the grid operator's requirements is essential. A properly built meter installation matters not only to the electricity provider; it determines the stability of the whole electrical system. TeleHome's experienced team makes sure the meter point meets every regulation, whether it is a new connection or an upgrade to an existing supply.

  3. 03

    Sockets, switches and fittings

    Second fix is where electrical work finally becomes visible. When positioning switches, sockets, light fittings and other accessories, usability matters just as much as appearance. Bathrooms need particular attention, as the wet environment brings stricter safety requirements. Here too, TeleHome favours solutions that are safe and convenient over the long term. The cost of this stage always reflects the products chosen and the specifics of the space.

  4. 04

    Low-voltage systems and alarms

    Low-voltage systems play an ever greater role in modern homes, including the alarm systems that form the basis of home security. An alarm system should be designed around the building and the way its occupants live. TeleHome installs alarm systems for family houses that protect the property discreetly yet effectively: a well-designed system is unobtrusive but gives continuous peace of mind.

  5. 05

    Pricing

    Electrical costs depend on many factors, which is why we do not work from a fixed price list. Installing a complete new system is a different job from a partial renovation or alteration. For a family house, the price depends on floor area, the functions required, the type of meter installation and the complexity of the second fix. TeleHome prepares a tailored quote in every case so you have a clear picture of the expected costs.

References

Electrical projects

Frequently asked questions

Frequently asked questions

Do you carry out complete rewiring?

Yes. We carry out full rewiring using modern systems that meet current standards, which is particularly important when renovating an older apartment.

Is rewiring necessary in older apartments?

Where old aluminium wiring is present, replacement is strongly recommended for both safety and load capacity. A modern system is essential for today's demands.

Do you install smart home systems?

Yes. We install modern smart home systems tailored to your needs, improving both comfort and energy efficiency.

How long does the electrical work take?

Completely rewiring an average apartment takes 1–3 weeks. On new builds the schedule follows the overall construction programme; the exact time depends on the size of the project.

Do you provide an electrical safety certificate?

Yes. Where required, the work is completed with standardised testing and documentation, and we hand over the electrical safety (érintésvédelmi) certificate confirming compliance.

Is my current metering point enough for a heat pump, air conditioning and an induction hob?

In older apartments and houses the connection is typically 1×16–1×32 A, which is not enough for a heat pump, induction hob, air conditioning and an EV charger together – the circuit breaker keeps tripping. In that case the connected load has to be upgraded to 3×32 A or more: we convert the metering point to a standard meter-cabinet installation and prepare the documentation for the electricity supplier ourselves. During the on-site survey we check the condition of the metering point and the steps needed for the upgrade.

Do you install electric car chargers at home?

Yes: we install an 11 kW (3×16 A) wallbox on a separate circuit with an RCD and overcurrent protection, and with dynamic load management if required, so that charging never exceeds the connected load of the house. In a new house it is part of the Platinum package; in a renovation it is worth doing together with the metering-point upgrade. In an apartment-building garage we coordinate with the building manager because of shared metering and fire-safety regulations.

How can I tell there is aluminium wiring in the walls, and why does it need replacing?

Prefabricated and brick apartments built between 1960 and 1985 almost always have aluminium wiring: the conductors are silver-coloured at the joints, sockets get warm, lights flicker and the distribution board still has old fuse cartridges. Aluminium loosens and oxidises at the joints – one of the main causes of house fires – and cannot handle today's loads (air conditioning, oven, water heater). In a renovation we recommend replacing the entire network with copper wiring and an RCD-protected distribution board – it is 25–35% of the cost, but the most important hidden work.

When does the electrician come in a full apartment renovation?

After demolition and before the plasterboard and the screed: this is when the chases for the cables are cut and the boxes, conduits, metering point and distribution board are installed. After the plasterboard is closed and the walls are plastered, only the fitting-out (switches, sockets, lights) remains, after painting. Light positions and the conduits for the smart home and alarm system must be planned at this stage – adding them later is expensive. The project manager keeps the sequence on track, and the concealed wiring is photo-documented.

How much does it cost to rewire an entire apartment?

The price depends on the size of the apartment, the number of circuits and fittings (2–6 sockets per room), the metering-point upgrade, the low-voltage requirements (UTP, TV, alarm, smart home) and the range of fittings chosen. In a full apartment renovation, the electrical and mechanical work together make up 25–35% of the cost. The itemised cost estimate shows materials and labour per circuit and per fitting; at the end we provide an electrical safety test report.

Request a quote

Request a no-obligation quote

On-site survey, itemised cost estimate, fixed deadline and warranty – we reply within 1 business day.

  • Reply within 1 business day
  • Itemised cost estimate
  • Fixed price, fixed deadline, warranty
No obligationMon–Fri 8:00–18:00 · info@telehome.hu