Home Renovation
Renovation – overviewApartment renovationHouse renovationShop, office, restaurant
House building
House building – overviewBrick / YTONG houseSIP panel house
References About Blog Client portal Request a quote +36 30 366 0936

info@telehome.hu · 20+ years of professional background

Window and Door Replacement
Windows and Doors

Window and door replacement with precise installation

Survey, removal, replacement, professional fitting, making good and final adjustment, all handled as one process.

Windows and Doors

Windows and doors done properly

The right windows and doors are about far more than looks: they determine how well your home retains heat, keeps out noise and feels to live in. TeleHome offers a complete service, with survey, removal of the old units, replacement, professional installation, making good and final adjustment all handled as a single process.

  • uPVC, timber and aluminium window and door systems
  • New, quality units only, never second-hand frames
  • Thermal-bridge-free installation with vapour control and breathable membranes
  • Replacement in prefab panel buildings, fixed to reinforced concrete
  • Plastering, making good and fine adjustment after fitting
Window and Door Replacement | TeleHome
Outstanding20+ years of professional background
How we work

How it works

Every step is designed to protect the quality and durability of the finished result.

  1. 01

    Materials and systems

    Choosing the right system depends on the building and the performance you expect. uPVC windows offer excellent value and good thermal performance, and with accessories such as trickle vents they can provide controlled ventilation too. Timber windows give a building a natural look and timeless character, while aluminium systems allow for modern, large glazed areas with outstanding structural stability. TeleHome only installs new, quality systems: we do not fit salvaged or second-hand windows, because their long-term thermal and air-tightness cannot be guaranteed.

  2. 02

    The replacement process

    A professional window replacement does not end when the new unit is lifted into place. The process includes removing the old frame, checking the condition of the reveal, accurate alignment and fixing, foam sealing, external and internal sealing, and making good. Replacing windows in prefab panel buildings needs particular care, as the fixing into the reinforced concrete structure and a thermal-bridge-free junction are critical.

  3. 03

    Installation and sealing

    Correct installation starts with precise levelling and stress-free fixing. Sealing a window is not just a matter of expanding foam: correctly applied vapour barrier and breathable membrane layers keep the junction free of thermal bridges and prevent condensation for years to come. After installation we carry out any fine adjustment needed, correcting the closing action and hardware on uPVC units, for example.

  4. 04

    Repair and maintenance

    Full replacement is not always necessary. Some problems can be solved by repairing the existing window, such as replacing hardware or seals or adjusting the closing mechanism. uPVC windows can often be repaired if the frame itself is in good condition. Regular maintenance and periodic adjustment significantly extend the life of your windows and doors.

  5. 05

    Pricing

    The cost of new windows and doors depends on several factors: size and quantity, the material chosen (uPVC, timber or aluminium), the type of glazing, the extent of removal and making good, and any special accessories such as trickle vents or shutter preparation. There is a big cost difference between a straightforward swap and renewing a whole facade. TeleHome always gives an exact quote after a site survey.

References

Window and door projects

Frequently asked questions

Frequently asked questions

How long does window replacement take?

In an average apartment, all the windows can be replaced in as little as one day. Larger jobs or custom sizes may take longer.

Will you need to break out the wall?

Removing the old windows involves only minimal disruption. We aim for the least possible damage to walls and plaster, which keeps the job fast and clean.

What types do you recommend?

We recommend uPVC and aluminium windows with modern insulating glazing. The choice depends on your energy goals and budget.

Do you handle the finishing work too?

Yes. After installation we take care of repairs, plastering and making good, and can include painting if you wish. It is a complete, end-to-end service.

Do I need a permit to replace windows in Hungary?

Usually no permit is needed if the size and the appearance of the facade do not change. In a condominium building it is worth agreeing with the building manager (közös képviselő) beforehand, especially in prefab panel blocks.

Should I choose uPVC, timber or aluminium windows?

For an apartment renovation and an average detached house, 5–6 chamber uPVC windows with triple glazing offer the best value for money (Uw ≤ 1.0 W/m²K) and need no maintenance. Timber windows are natural and easy to repair, but need surface treatment every 5–8 years; they are often a requirement in period apartments and on listed facades. Aluminium and timber-aluminium are the answer for slim profiles, large panoramic glazing and lift-and-slide (HST) doors, at a higher price. In an apartment building, the uniformity of the facade must be respected.

Is double glazing enough, or do I definitely need triple glazing?

Today we recommend triple, argon-filled glazing with a warm-edge spacer: the U-value of the window goes below 1.0, there is no cold radiation next to the window in winter, and the sound insulation is better too – the difference is 10–15% of the total cost, which quickly pays back on heating. Double glazing is justified in unheated rooms (garage, pantry) or where the shallow depth of the old frame does not allow thicker glass. In a new house, triple glazing is practically compulsory for energy class A.

Can windows be replaced in winter too?

Yes. Replacing one opening takes 1–2 hours, and during this time the apartment only cools down one room at a time; the expanding foam and sealing tapes can be worked down to −5 °C in their winter versions. The advantage of a winter replacement is that the manufacturers' lead times are shorter, and you feel the difference in draughts and cold radiation immediately. In persistent frost and wet weather we schedule the external rendering for later.

Do you install roller shutters, insect screens and sills together with the windows?

Yes, and it is worth doing them together: the roller shutter box (top-mounted or renderable) can only be insulated free of thermal bridges together with the window installation; it cannot be added neatly afterwards. For electric roller shutters we install the wiring in advance. The internal (uPVC or timber) and external (aluminium) sills, the insect screen, the trickle vent and the child lock are separate lines in the itemised quote – no surprises on the final invoice.

What determines the price of window replacement?

The size and number of the windows, the material and class of the profile, the glazing (double or triple, acoustic, safety), the colour foil, the extent of the demolition and reveal repair (rendering, plasterboarding, painting), and the extras (roller shutter, insect screen, sill). In a panel block, fixing to the reinforced concrete and the thermal-bridge-free junction is additional work. After an on-site survey we give you an itemised, fixed-price quote including the finishing work.

Request a quote

Request a no-obligation quote

On-site survey, itemised cost estimate, fixed deadline and warranty – we reply within 1 business day.

  • Reply within 1 business day
  • Itemised cost estimate
  • Fixed price, fixed deadline, warranty
No obligationMon–Fri 8:00–18:00 · info@telehome.hu