
Property survey and cost estimate: a solid foundation for your project
Every successful renovation or new build in Hungary starts with a thorough survey and a transparent budget, so there are no surprises once work begins.
Surveys done properly
Good planning is what separates a smooth renovation from a stressful one. The purpose of our survey and cost estimate is to make clear, before any work starts, what needs to be done, which technical solutions are required and what it will all cost. TeleHome begins every project with a detailed on-site survey and a conversation about your needs, so you know exactly what to expect from the build.
- Hidden defects identified before work starts
- Itemised budget covering materials and labour
- Fixed-price contract available on a detailed technical scope
- Detailed quote typically within 5–10 working days
- All trades coordinated by one general contractor

How it works
Every step is designed to protect the quality and durability of the finished result.
- 01
Why it matters
Preparation is easy to underestimate, yet most problems on site come from incomplete planning. During a thorough survey we look beyond the visible defects to the hidden factors that could become expensive later. This is especially important when renovating a house, where the whole structure is affected, when renovating an apartment, where new work has to fit existing systems, and when preparing a new build. The goal is always the same: a stable, predictable starting point.
- 02
The survey process
Our process is built up step by step so that no detail is missed. We inspect the structural condition of the building, the existing services (electrical, water, heating), the floor and wall finishes, and the state of the roof, facade and external elements. Where relevant we also cover roof renovation, loft conversion or changes to the garden and outdoor areas. The result is a complete picture of the property as it stands today.
- 03
Preparing the cost estimate
An accurate estimate is based on the data gathered during the survey, not on guesswork. This lets you see the expected costs clearly right at the start of the project. The budget lists the work phases required, material costs, labour and installation costs, and a schedule. The whole project becomes transparent and hidden costs are avoided.
- 04
One integrated approach
One of TeleHome's biggest advantages is that we never think in isolated services. The survey and cost estimate feed directly into every part of the build: planning the full scope, coordinating the different trades and optimising the sequence of work. Whether it is an apartment renovation, a house renovation or a new build, the aim is a project that stays under control from start to finish.
- 05
Saving time and money
Proper preparation saves both time and money. An accurate survey and budget help you avoid schedule slips, unnecessary demolition and rework, and unexpected costs. From the very first step, our aim is for you to feel secure and know exactly what to expect throughout the project.
Frequently asked questions
How much does an on-site survey cost?
HUF 20,000 + VAT in Budapest, HUF 30,000 + VAT outside Budapest (within a 20 km radius); if you accept our quote, we credit it in full.
What does the detailed cost estimate include?
The estimate is fully itemised, listing materials and labour separately, so the total cost of your investment is clear. It is the basis of every well-organised build.
How long does it take to receive the estimate?
We usually deliver the detailed quote within 5–10 working days. Larger or more complex projects can take longer.
Is a survey required before work can start?
Yes. It is essential for an accurate quote and for uncovering hidden defects, and it is what makes the build run smoothly, especially on larger renovations.
Do you offer a fixed price based on the estimate?
Yes. On the basis of a detailed technical scope we can sign a fixed-price contract, so the cost of your renovation or build is locked in and predictable.
What happens at the on-site survey, and what should I prepare?
The survey takes 1–2 hours: we measure the rooms, check the walls and the plinth with a moisture meter, inspect the electrical system and the meter position, the water and drainage pipes, the floor screed and the windows and doors, and discuss what you would like. If you have a floor plan, earlier drawings, the apartment building's founding deed or ideas for finishes (photos, Pinterest), bring them along – they speed up the cost estimate. At the end of the survey you already receive professional advice on site about what is worth doing and what is not.
Can you quote a price from photos or a floor plan, without a survey?
An indicative range, yes – you can use the 2026 market prices published on our apartment renovation page for that – but not a fixed-price quote, because the condition of the hidden structures cannot be seen in a photo, and these can account for as much as 20–40% of the cost. House building is different: on the basis of construction drawings we prepare a priced bill of quantities to the design even without an on-site survey.
Why is the survey charged for when it is free elsewhere?
Because with us the survey is not a rough estimate over the phone, but a professional condition assessment from which an itemised, detailed cost estimate is prepared – materials and labour on separate lines, with a schedule. This is a usable document in its own right: for the bank, for a grant application, for comparing other quotes. The fee is HUF 20,000 + VAT in Budapest and HUF 30,000 + VAT within a 20 km radius, and if you accept our quote we credit it in full – so for anyone who renovates with us, it is free.
I already have a designer's bill of quantities – will you price it?
Yes. We price an unpriced bill of quantities item by item, and we flag any item that is missing from it (demolition, rubble removal, screed, insulation, temporary power) that will arise in reality – between two quotes it is often these omitted lines that cause a difference of tens of millions of forints. For an unpriced bill of quantities or a consultation, the quote is free of charge; a priced bill of quantities prepared from construction drawings is charged for, and credited if you accept the quote.
How long is the quote valid, and what if I decide later?
The quote is typically valid for 30 days. Beyond that we update the material prices, but the labour and the technical specification do not need to be surveyed again – updating the cost estimate is quick. The price is fixed when the contract is signed: we do not ask for more afterwards for the technical specification recorded in the contract appendix; only a modification you request, priced in advance, changes it.
Request a no-obligation quote
On-site survey, itemised cost estimate, fixed deadline and warranty – we reply within 1 business day.
- Reply within 1 business day
- Itemised cost estimate
- Fixed price, fixed deadline, warranty




