Porotherm brick walls and slab formwork under construction
Traditional masonry construction

Brick and YTONG house building – the proven way, turnkey

Porotherm or YTONG walls, reinforced-concrete slab, insulated façade – with a fixed specification, delivered by a general contractor.

Why traditional construction?

Solid, durable, holds its value

Masonry is the most widespread building method in Hungary: the load-bearing walls are built from clay or aerated concrete blocks, and the slab is in-situ reinforced concrete or a precast beam system.

  • Long service life, excellent value retention and resale prospects
  • High thermal mass – a balanced indoor climate in summer too
  • Excellent acoustic properties
  • A wide choice of materials and designers, and easy to alter later
  • Accepted without difficulty by every bank and subsidy scheme (CSOK Plusz, Otthon Start – the latter is being restructured, the announced Wekerle Plusz replaces it from 2027)

Worth considering: longer construction time, a wet-trade process exposed to the weather, greater self-weight and larger foundations.

Flat-roofed, two-storey family house under construction – TeleHome
Outstanding20+ years of professional background
Specification

Three packages – all three turnkey

The prices apply to traditional building technology. The itemised specification is an annex to every quote and part of the contract.

Silver
Standard specification
from net HUF 650,000/m²

A reliable standard specification that is good value for money

  • Porotherm / YTONG walls, 15 cm façade insulation
  • Triple-glazed uPVC windows and doors
  • Condensing gas boiler with radiators or air-to-water heat pump with underfloor heating
  • Ceramic tiles, laminate flooring, standard sanitary ware
Itemised specification → Request a quote
Platinum
Premium specification
from net HUF 900,000/m²

Materials and equipment of the highest standard

  • Premium façade, aluminium or timber-aluminium windows and doors
  • Heat pump + heat-recovery ventilation + solar panels
  • Smart home, electric shading, EV charger
  • Personalised interior design
Itemised specification → Request a quote

The list is for information only; the itemised content of the packages is set out in the quote prepared for the specific design.

Itemised specification by package

Click on the rows for details – this list is the basis of the annex to the quote.

ItemSilverGoldPlatinum
Foundation & plinthReinforced concrete strip foundation (C20/25) to the structural design, formwork-block plinth wall with ring-beam reinforcement. 12 cm reinforced ground slab with welded mesh on a compacted gravel bed; bituminous damp-proof membrane. 10 cm XPS plinth insulation with plinth render.Reinforced strip or raft foundation (C25/30) based on the soil report and structural design, 15 cm reinforced ground slab. Two-layer bituminous damp-proof membrane, 12 cm XPS plinth insulation, finished with pebble-dash or mineral render.Thermal-bridge-free reinforced raft foundation (C25/30, XC2) with 15–20 cm load-bearing EPS/XPS insulation beneath the slab, or a strip foundation with a full plinth thermal break. Two-layer radon-resistant bituminous membrane, 15 cm XPS plinth insulation, premium plinth cladding (e.g. porcelain or cast-stone tiles).
Load-bearing walls & partitionsExternal load-bearing walls in Porotherm 30 N+F or YTONG 30 blocks, laid in thin-bed or conventional mortar. 10 cm Porotherm 10 N+F or YTONG 10 partition walls. System lintels above openings.External walls in Porotherm 30 Klíma or YTONG 30 Lambda+ blocks, Dryfix / thin-bed adhesive bonding for improved thermal performance. 10 cm partitions, upgraded to 12 cm around wet rooms and service shafts. 25 cm internal load-bearing walls.External walls in Porotherm 38 Klíma / 30 X-therm Rapid or YTONG 30 Lambda+ blocks; Porotherm AKU or YTONG acoustic partitions between bedrooms and wet rooms where required. 12 cm partitions, pre-chased service routes, acoustic separation at upper-floor structures.
Slabs, ring beams & lintelsPrecast beam-and-block slab (Porotherm or Leier) with structural topping, or a monolithic reinforced concrete slab to the structural design. Monolithic reinforced concrete ring beams on all walls with insulated ring-beam elements. System lintels (Porotherm A-10 / YTONG) above openings.Monolithic reinforced concrete slab (C25/30, 18–20 cm) to the structural design, thermal-bridge-free ring beams. Reinforced concrete lintels for larger openings over 2.5 m; balconies and terrace slabs with Isokorb-type thermal-break connectors.Monolithic reinforced concrete slab (C25/30, 20 cm) with an acoustic floating build-up under upper-floor rooms. Concealed reinforced concrete lintels for panoramic openings (up to 4–5 m) with integrated shutter and screen boxes; fully thermal-bridge-free ring-beam and balcony connections.
Roof structure, covering & flashingTimber gable or hipped roof with fungicidal and fire-retardant treatment, breathable underlay, counter-battens and battens. Concrete roof tiles (e.g. Bramac or Terrán entry range) with matching ridge and edge elements. Galvanised colour-coated steel gutters and downpipes, standard flashings.Timber roof or prefabricated nail-plate trusses, high-permeability taped underlay. Mid-range concrete tiles (e.g. Terrán Zenit, Bramac Reviva) or clay tiles (e.g. Tondach); snow guards, roof hatch and aerial outlet. Aluminium or colour-coated steel flashings. For flat roofs, PVC/TPO membrane on tapered insulation.Structurally designed timber roof with premium clay tiles (e.g. Tondach, Creaton) or standing-seam metal roofing (e.g. Prefa, Lindab); flat roofs with two-layer membrane and extensive green-roof preparation. Full aluminium flashing, concealed gutters on request, solar mounting preparation and lightning protection.
Facade insulation & render15 cm graphite EPS 80 facade insulation, glued and dowelled, with glass-fibre mesh base coat. Tinted thin-layer silicate or silicone-resin render (e.g. Baumit, Masterplast), 1.5 mm grain, in one facade colour. Attic slab with 25 cm mineral wool or blown insulation.20 cm graphite EPS 80 insulation (mineral-wool fire barriers around openings), silicone-resin render in two colours or partial facade cladding (e.g. brick slips up to 10–15 m²). Covered terrace soffits rendered or timber-clad; 30 cm attic/roof insulation.20 cm rock wool or graphite EPS facade insulation with premium silicone-resin render, plus architectural cladding (e.g. porcelain, HPL, thermo-wood or clinker brick) on selected areas. 35–40 cm roof/attic insulation, fully detailed thermal-bridge-free junctions.
External windows, doors & shadingTriple-glazed, 5–6 chamber uPVC windows (e.g. Rehau Euro-Design 70, Kömmerling 76 AD), Uw ≤ 1.0 W/m²K, white or single-sided colour foil. Insulated uPVC entrance door with 3-point lock, internal PVC and external aluminium sills. Shutter provision to bedrooms.Triple-glazed uPVC windows with warm-edge spacers (e.g. Rehau Synego 80, Kömmerling 88), Uw ≤ 0.85 W/m²K, colour foil both sides, concealed hardware. Aluminium entrance door, lift-and-slide (HST) patio door in the living room. Electric roller shutters to all bedrooms and the living room, insect screens.Aluminium or timber-aluminium windows (e.g. Schüco, Aluprof, Internorm) with triple glazing, Uw ≤ 0.8 W/m²K, slim-profile floor-to-ceiling panoramic glazing and HST sliding door. Electric aluminium shutters or zip-screens on every opening with central control; premium entrance door with fingerprint or keypad access.
Interior doorsCPL or decor-foil interior doors with adjustable frames, steel hinges and standard handles; interior door allowance HUF 70,000 net per door (indicative).CPL or veneered full-height (210 cm) interior doors with concealed hinges, magnetic latches and branded handles; one pocket sliding door. Allowance HUF 120,000 net per door (indicative).Premium ceiling-height or frameless flush-to-wall (concealed frame) interior doors in veneer, lacquer or glass, with concealed hinges and designer handles; allowance HUF 220,000 net per door (indicative).
Heating, cooling & hot waterCondensing gas boiler (e.g. Viessmann, Immergas, Bosch) with panel radiators and thermostatic valves, or an air-to-water heat pump (e.g. Daikin, Gree) with underfloor heating, depending on the site. Indirect DHW cylinder (150–200 l), single-zone room thermostat control.Air-to-water heat pump (e.g. Daikin Altherma, Mitsubishi Ecodan, Viessmann Vitocal) with underfloor heating, room-by-room zone control, 200–250 l DHW cylinder. Electric towel radiators in bathrooms; one split air-conditioner in the living room.Premium air-to-water heat pump (e.g. Viessmann, Daikin, NIBE) with underfloor heating and ceiling heating-cooling, controlled per bedroom via smart thermostats. 300 l DHW cylinder with recirculation, multi-split cooling in every bedroom and the living room.
Plumbing, drainage & gasMultilayer PPR/PEX hot and cold water pipework (e.g. Wavin, Rehau), insulated, PVC-KG drains, external and rainwater connections within the plot. Gas pipework from the meter to the boiler; one garden tap, washing machine and dishwasher connections.Manifold-based PEX system to every outlet, pressure reducer and water filter, DHW recirculation line. Rainwater harvesting provision (tank connection), two outdoor taps, irrigation preparation, provision for a central water softener.Full manifold system with central water softener and filtration, timed DHW recirculation, leak detection with automatic shut-off. Rainwater harvesting system with tank and pump, controlled garden irrigation, pool provision on request.
Electrical & low-voltageConcealed copper wiring rated for a 3×32 A supply, consumer unit with MCBs and RCD; 2–3 sockets and 1 switch per room, 6 sockets in the kitchen, 5 in the living room. Standard switchgear (e.g. Schneider Asfora, Legrand Valena), TV and internet cabling to the living room, doorbell, light points provided (no fittings).Extended installation: 4–6 sockets per room, two-way lighting, outdoor and terrace sockets, Cat6 to every bedroom and the living room, wiring for shutter control. Mid-range switchgear (e.g. Schneider Sedna, Legrand Niloé), LED spot provision in suspended ceilings, alarm pre-wiring, cabled position for a solar inverter.Star-topology or KNX/smart-home-ready cabling, designer switchgear (e.g. Schneider Unica, Gira, Jung), video intercom, alarm system with sensors, structured network with rack cabinet and Wi-Fi access points. 11 kW EV wallbox installed, controlled LED lighting circuits, exterior lighting.
Ventilation, solar & smart homeExtract fans in wet rooms, cooker hood duct. Solar provision: empty conduit from roof to consumer unit. Smart home not included.Provision for central heat-recovery ventilation (duct routes, plant space) or decentralised heat-recovery units in bedrooms. 3–4 kWp solar PV system with inverter installed, app-controlled smart thermostat and shutters.Central heat-recovery ventilation system (e.g. Zehnder, Helios) installed with enthalpy exchanger and filters. 5 kWp solar PV with hybrid inverter and battery provision. Smart-home base: lighting, shading, heating-cooling, alarm and intercom in one system (e.g. Loxone or KNX), including an interior-design consultation.
Internal plaster, screed & paintingMachine-applied gypsum plaster, two-coat skim, white emulsion paint. Floor build-up: 10 cm EPS 100 load-bearing insulation + 6 cm screed. Plasterboard ceilings in attic rooms; concrete slab for terrace and entrance.Machine gypsum plaster, Q3 skim finish, coloured emulsion (up to 3 colours), liquid tanking in wet rooms. 12 cm EPS 100 / graphite floor insulation + 7 cm screed with insulated edge strip; plasterboard suspended ceilings with LED provision in living room and corridors.Q4 skim finish, premium paint or decorative plaster, feature wallpaper on one or two walls per the interior-design proposal. 15 cm graphite floor insulation + floating screed with impact-sound insulation, suspended ceiling with concealed LED lighting in the living room; acoustic ceilings on request.
Floor & wall finishesPorcelain tiles in wet rooms, kitchen and hall (up to 60×60 cm, grid layout), bathroom wall tiling to 2.1 m. 8 mm AC4 laminate in bedrooms with skirting. Allowance: tiles HUF 6,000 net/m², laminate HUF 5,000 net/m² (indicative).Large-format porcelain (up to 90×90 cm or 30×120 cm) floors and full-height wall tiling in bathrooms, flexible S1 adhesive. 10–12 mm laminate or SPC vinyl flooring in bedrooms. Allowance: tiles HUF 10,000 net/m², warm flooring HUF 8,000 net/m² (indicative).Premium large-format porcelain or natural stone (up to 120×120 cm, 120×240 cm wall slabs), walk-in shower with linear drain. Three-layer oiled or lacquered engineered hardwood or premium SPC in bedrooms. Allowance: tiles HUF 18,000 net/m², wood flooring HUF 15,000 net/m² (indicative).
Sanitary ware & tapsWall-hung WC with concealed cistern (e.g. Geberit Duofix or Alcaplast), ceramic basin, acrylic bath or shower tray with glass screen, chrome single-lever taps (e.g. Mofém, Grohe entry range). Sanitary allowance HUF 800,000 net for one bathroom + one WC (indicative).Rimless wall-hung WC with soft-close seat, basin with vanity unit, 8 mm glass shower screen with floor drain, concealed rain-shower system, branded taps (e.g. Grohe, Hansgrohe). Sanitary allowance HUF 1,500,000 net (indicative).Premium sanitary ware (e.g. Villeroy & Boch, Duravit, Laufen), shower-toilet, freestanding bath, double-basin vanity, thermostatic concealed shower systems (e.g. Hansgrohe, Grohe premium range, Dornbracht), coloured or matt-black finishes on request. Sanitary allowance HUF 3,000,000 net (indicative).

The specification above is for guidance only; the allowances and product examples are indicative, and the final technical description and price are fixed in the quotation and construction contract prepared from the actual drawings, site conditions and individual requirements. The Silver package starts from HUF 650,000 /m² net, based on a single-storey building of average geometry.

Not included in the turnkey price
  • Land, plot purchase and conveyancing costs
  • Planning and construction drawings, structural design and energy certificate fees (quoted separately)
  • Geodetic setting-out and soil investigation report
  • Utility connection, network development and meter installation fees (water, sewer, gas, electricity)
  • Fencing, gates, retaining walls, landscaping and ground shaping
  • Paving, driveway, footpaths and terrace surfacing beyond the area fixed in the package
  • Kitchen units, built-in appliances, furniture, curtains and rails
  • Light fittings and decorative lighting (light points are included)
  • Fireplace, pool, sauna and garage-door automation unless included in the contract
  • Authority, bank and insurance fees during construction, and removal of excavated soil from the site
Price calculator

How much would your brick or YTONG house cost?

An indicative net price based on your floor area and specification package. We prepare an exact quote from the construction drawings.

120 m²
Specification packageWhat do the packages include?
Level of completion
Optional extras
Indicative net price · turnkey
—
starting price, with the selected content

    Choose a specification package – what it includes will appear below the price.

    Request an exact quote
    Brick vs. YTONG

    Two types of masonry – when to choose which?

    Clay block (e.g. Porotherm 30 N+F / 30 Klíma)

    • Greater thermal mass, better airborne sound insulation (~50 dB)
    • Less absorbent, robust structure
    • Ideal for: a family house facing the street, a two-storey house, or when a quiet, “heavy” house is the aim
    U-value, 30 cm + 10 cm EPS~0.22 W/m²K
    Lead time8–16 months

    Aerated concrete (YTONG 30 / 37.5)

    • Light, precise, faster to lay – thin-bed adhesive mortar
    • Better thermal insulation at the same wall thickness
    • Ideal for: a single-storey house, a faster structural phase, easier chasing and installation
    U-value, 30 cm + 10 cm EPS~0.16 W/m²K
    Lead time8–14 months
    Process

    How your brick house is built

    1. 1
      1–2 weeks

      Consultation and quote

      Plot, needs, budget. We prepare an itemised quote from an unpriced bill of quantities or from drawings; from construction drawings we prepare a priced bill of quantities (its fee is credited if you accept our quote).

    2. 2
      2–4 weeks / 2–4 months

      Design, permits

      With our partner architects the permit and construction drawings, the energy certificate and the structural design are prepared. Simple notification: 2–4 weeks, building permit: 2–4 months.

    3. 3
      3–5 weeks

      Earthworks, foundations, plinth

      Site levelling, strip or raft foundation according to the structural design, preparation of utility connections, ground slab, damp-proofing against ground moisture.

    4. 4
      3–5 months

      Structure

      Masonry, ring beams, lintels, slab, stairs, roof structure and roof covering. The building is “structurally complete”.

    5. 5
      4–7 months

      Building services, finishing works

      Windows and doors, first-fix electrics and building services, plastering, insulation, screed, tiling and flooring, painting, second fix – turnkey handover, occupancy permit.

    Reference

    Érd – turnkey, two-storey family house

    Érd, construction of a turnkey family house – TeleHome

    In Érd we carried out the complete turnkey construction of a two-storey family house of more than 200 m². The 30 cm Porotherm walls received 10 cm of graphite façade insulation, and the flat-roofed structure with reinforced-concrete slabs is a modern and durable solution.

    The complete building services were built around a heat-pump heating and cooling system, prepared for the later installation of a solar panel system and an electric car charger. Foundations adapted to the rocky ground conditions and a soakaway system in line with local regulations were also part of the work.

    More house building references
    Build-ups and energy performance

    With what build-up does a brick house reach energy class “A”?

    The thickness of the insulation says little on its own. What counts is the thermal transmittance (U-value) of the complete build-up – for the wall, the roof, the floor and the windows alike. This is how the basic structure of the Silver package compares with the statutory limits.

    StructureBuild-up (Silver package)U-value, approx.Limit for a new house
    External wall – brick1.5 cm internal gypsum plaster · 30 cm Porotherm 30 N+F · 15 cm graphite EPS · thin-coat decorative render~0.16 W/m²K0.24 W/m²K
    External wall – YTONG1.5 cm internal plaster · 30 cm YTONG 30 · 15 cm graphite EPS · decorative render~0.12 W/m²K0.24 W/m²K
    Attic slab / pitched roofreinforced-concrete or beam slab · vapour control membrane · 30 cm mineral wool in two layers · ventilated roof space~0.13 W/m²K0.17 W/m²K
    Ground floor slab12 cm reinforced ground slab · bituminous damp-proofing against ground moisture · 10 cm load-bearing EPS 100 · 6 cm screed · floor covering~0.30 W/m²K0.30 W/m²K
    Window, balcony doortriple glazing with argon filling, 5–6-chamber uPVC frameUw ≤ 1.0 W/m²K1.15 W/m²K

    The U-values are indicative calculations; the exact values are set out in the construction drawings and the energy certificate. The Gold package goes further with 20 cm of façade insulation and 12 cm of floor insulation, the Platinum with a thermal-bridge-free raft foundation, 15 cm of floor insulation and a fully installed heat-recovery ventilation system.

    What do classes BB, A and A+ mean?

    Until November 2023 the classes had two letters (BB was the “nearly zero-energy” level, AA the excellent one).

    • Since ÉKM Decree 9/2023 the scale has used single letters from A+++ to I: for a new house class A is the mandatory minimum, roughly the equivalent of the old BB.
    • A+ (50–90% of the reference) and A++ (0–50%) can be reached with heat-pump building services and solar panels.

    Why is a brick house cooler in summer?

    A 30 cm masonry wall and a reinforced-concrete slab mean several hundred kg/m² of mass, which absorbs heat during the day and releases it at night.

    • This thermal mass dampens the daily temperature swing by 2–4 °C and delays the afternoon peak by several hours.
    • With external shading and night-time ventilation the house is comfortable without air conditioning on most summer days.

    Where is energy consumption really decided?

    In a class A house the wall is no longer the main source of heat loss: thermal bridges, airtightness and ventilation are decisive.

    How we handle itThat is why we close off the ring beam and the plinth with insulation, why the Gold package includes at least the pre-installation for ventilation and the Platinum a fully installed heat-recovery system – and why it is worth asking for an airtightness measurement (blower door test) before handover.

    Typical faults

    What ruins a masonry house – and how do we prevent it?

    Over our team's more than twenty years of experience we have seen enough faulty brick houses to know that the problems almost always arise at the same five or six points. We check these during the structural works, with photo documentation, before they are covered up.

    Thermal bridge at the ring beam and the lintel

    A reinforced-concrete ring beam and a lintel conduct heat many times better than the masonry.

    • If they are not covered by at least 5–8 cm of insulation on the outside, the surface cools down in the internal corners and mould appears.

    How we handle itWe build in a ring-beam element from the same system or a separate XPS strip, and the façade insulation covers it without gaps.

    Plinth and ground moisture

    The most common case of damp appearing later starts at the plinth: the horizontal damp-proof course is not lapped with the plinth waterproofing, or the façade EPS runs down to the ground.

    How we handle itWe use closed-cell XPS on the plinth, take it 30 cm below ground level and carry the waterproofing through under the masonry.

    YTONG and moisture

    Aerated concrete absorbs water quickly, so during construction we cover the top of the walls and close the façade only after the structure has dried out.

    • Important: YTONG needs a thin-coat, vapour-permeable render and the adhesive from the same system – with a traditional cement render it cracks.

    A different block goes into the wall than the one designed

    A house designed for YTONG cannot simply be built from Porotherm without rethinking it, or the other way round: the compressive strength and the layout of the ring beams and lintels are different.

    How we handle itThe structural engineer designs for the specific block – that is why our quote states the brand and the type, not just a “30 cm wall”.

    Flooring and paint applied to a damp structure

    If parquet or laminate is laid on the screed before the necessary drying time has passed, it buckles; paint applied to fresh plaster turns patchy.

    How we handle itWe check with a moisture meter (screed CM measurement: ≤ 2 CM% before flooring) and schedule the finishing works accordingly.

    Chasing into the finished wall afterwards

    Horizontal chases weaken a load-bearing wall, especially one built of YTONG.

    How we handle itWe fix the service routes before the masonry starts and design in the risers and service shafts, so the finished structure no longer has to be cut into.

    What has to be decided before the walls go up?

    With a masonry house, changes after the structural phase are expensive: a relocated socket costs a few thousand forints, a relocated bathroom several hundred thousand. We ask you for these decisions before the construction drawings are finalised.

    • Heating system: radiators or underfloor heating – this determines the floor build-up and the height of the slab
    • Position of the heat pump's outdoor unit, its concrete base and the condensate drain
    • Final layout of the wet rooms: the exact position of the WC, shower, bath and washing machine
    • Kitchen layout – where the sink, the hob (extractor outlet) and the dishwasher will be
    • Electrical connection capacity (3×32 A or more) for a heat pump, air conditioning and an EV charger
    • Solar panels: orientation of the roof, position of the inverter and the battery, route of the conduits
    • Heat-recovery ventilation: the plant room, and the ducts in the slab or in a suspended ceiling
    • Chimney or fireplace – the chimney base and the flue can only be built together with the masonry
    • Roller shutters and shading: the shutter box is built in together with the lintel and cannot be added neatly afterwards
    • Smart home, alarm, network: empty conduits to every room, even if the devices come later
    • Water softener, rainwater tank, garden tap and outdoor sockets – pipes and cables in the ground at the foundation stage
    • Power supply and control for the garage door, the fence and the gate motor
    Wet trades

    When can you move in, and what needs maintaining over 30 years?

    Concrete, mortar, plaster and screed together bring several thousand litres of water into a masonry house. This is not a fault but part of the technology – yet it has to be allowed for in the schedule and in the first heating season.

    • Screed:about 1 week of drying per cm, so 5–6 weeks for 6 cm before flooring; with underfloor heating we speed it up with a heating-up protocol
    • Internal plaster:2–4 weeks before skimming and painting, with good ventilation
    • Moving in:immediately after the occupancy permit, but in the first winter we recommend short, intensive airing several times a day, or heat-recovery ventilation
    • First 1–2 years:hairline cracks in the corners caused by the structure “settling” are normal – we repair them under the guarantee
    • Every 5–10 years:inspection of the façade, gutters and flashings, silicone joints in the wet rooms, annual service of the boiler or heat pump
    • 15–25 years:repainting the façade, inspecting the roof covering, replacing building services equipment – the masonry and the slab themselves have a service life of 100+ years
    Value retention and bank valuation. Bank valuers place a masonry house with reinforced-concrete slabs in the category with the longest economic life – typically 80–100 years – which is reflected both in the collateral value and in the price achievable on sale. Both the CSOK Plusz and the Otthon Start loan (the latter is being restructured – the announced Wekerle Plusz replaces it from 2027) accept it without question.
    Flat-roofed family house with travertine façade cladding and a metal-capped parapet – built by TeleHome
    Contract, payment, warranty

    How does a fixed-price house building contract work?

    A fixed price is not a magic word but the combination of three documents: the construction drawings, the itemised, detailed cost estimate and the building contract. If the three refer to one another, the word “fixed” means something.

    1. 1

      Itemised cost estimate = the basis of the fixed price

      The price is built on the itemised, detailed bill of quantities: every material, quantity and type of work on a separate line, with a unit price. So there is no “other works” line, and it is clear exactly what belongs to the turnkey price and what does not (e.g. utility connection fees, fitted kitchen, fence).

    2. 2

      What can change the price – and what cannot

      It is not changed by: changes in material prices, the weather, labour. It can be changed by: a change of content requested by you (additional work, approved in writing and priced in advance) and a difference in the foundations resulting from the geotechnical report – the latter we fix in the contract in advance, at a unit price.

    3. 3

      Scheduled payment tied to performance

      You pay the contract price in interim invoices tied to levels of completion: foundations, structurally complete, roof and windows, first-fix building services, turnkey handover. Every interim invoice is preceded by performance certified by the technical inspector, and the final invoice is due only once the snagging list has been closed. This can also be aligned with the stages of the bank's loan disbursement.

    4. 4

      Fixed deadline, with a penalty

      The contract fixes the turnkey handover deadline in calendar days and also sets out the legal consequences of delay. The only accepted reason for a delay is a change requested by you or the time taken by an official procedure – this, too, is documented in writing.

    5. 5

      Mandatory guarantee: 3, 5 and 10 years

      For a new residential building, Government Decree 181/2003 prescribes a mandatory guarantee, counted from the close of the technical handover: 3 years for building structures and built-in equipment in general, 5 years for, among other things, the roof covering, waterproofing, tiling and flooring and the building services pipework, and 10 years for the foundations, the load-bearing walls, the slab, the roof structure and the damp-proofing against ground moisture. In addition, we hand over the documented manufacturer's warranties of the built-in products (boiler, heat pump, windows and doors, roof tiles) at handover.

    How should you read a house building quote?

    The prices per m² of two quotes can only be compared if they cover the same content. Check these five points in every quote – in ours too.

    What to look atWhy does it matter?In the TeleHome quote
    Net or gross, and for which m²?There is a 12–18% difference between the gross floor area (measured to the outer face of the walls) and the net floor area, which can amount to a fifth of the price.net price, for the gross floor area (measured to the outer face of the walls), VAT shown separately
    Brand names and types“30 cm brick” or “triple-glazed window” is not a specification in itself; the type decides the price and the quality.manufacturer and type in 14 groups of items (e.g. Porotherm 30 N+F, Rehau Euro-Design 70)
    What is not included?Utility connections, design, geotechnical survey, fitted kitchen, fence, paving – these typically add up to several million forints.a separate “not included” list and option prices (terrace, paving, air conditioning, solar panels)
    Material allowancesTiles and flooring, sanitary ware, interior doors – if there is no allowance, “turnkey” means the cheapest version.net material allowance per item (e.g. interior door HUF 70,000 each, Silver)
    Payment schedule and deadlineThe size of the advance payment and how the interim invoices are tied to completion show who bears the risk.interim invoices tied to performance, a fixed deadline in calendar days in the contract
    FAQ

    Frequently asked questions

    Brick or YTONG – which is better?

    Both are proven masonry systems with an A1 fire rating. Clay block gives greater thermal mass and better sound insulation; YTONG gives a lighter, more precise wall with better thermal insulation at the same thickness, but it is more absorbent, so protecting the façade and the plinth is particularly important. We make a recommendation based on the plot, the drawings and the budget.

    How long does it take to build a brick house?

    From the permit to turnkey handover it typically takes 8–16 months, or 8–14 months with YTONG. The pace is set by the masonry structure and the drying times of the wet trades (concrete, plaster, screed).

    What do the Silver, Gold and Platinum packages include?

    All three mean a turnkey house you can move into; the difference lies in the level of the materials and building services. The itemised content is set out in the annex to the quote.

    What energy class does a brick house achieve?

    With modern masonry, 15–20 cm of façade insulation, triple-glazed windows and doors and heat-pump building services, a traditional house also reaches class “A” (nearly zero-energy), mandatory for new builds since November 2023, and with a heat pump and solar panels even class A+.

    Do you also build the house to structural shell stage, or only turnkey?

    Yes, we also take on structural shell construction: foundation, plinth, masonry, ring beams, lintels, floor slabs, stairs, roof structure and roof covering – you can select this stage of completion separately in the price calculator. We will add honestly: between the structural shell and turnkey there are several million forints and most of the risks (mechanical systems, insulation, thermal bridges, airtightness), so for the finishing work we also recommend an itemised approach with a single responsible contractor. Two quotes can only be compared at the same stage of completion and with the same technical specification.

    What warranty comes with a new brick house?

    For a new residential building, Government Decree 181/2003 prescribes a mandatory warranty counted from the technical handover: 3 years for building structures and built-in equipment in general, 5 years for, among other things, the roof covering, the waterproofing, the floor and wall finishes and the mechanical pipework, and 10 years for the foundation, the load-bearing walls, the floor slabs, the roof structure and the damp-proofing against ground moisture. On top of this, the 5-year implied warranty under the Civil Code applies, as well as our contractual guarantee and the manufacturers' guarantees on the installed products (boiler, heat pump, windows and doors, roof tiles), the documents for which we hand over at handover.

    How do I pay during the house build, and what can change the fixed price?

    You pay the contractor's fee in interim invoices tied to stages of completion: foundation, structural shell, roof and windows and doors, first-fix mechanical and electrical installation, turnkey handover. Every interim invoice is preceded by completion certified by the site supervisor, the final invoice is only due after the snag list has been closed, and the schedule can be aligned with the bank's loan disbursement. The fixed price is not changed by changes in material prices, the weather or labour; it can be changed by a change of scope requested by you, approved in writing and priced in advance, or by a deviation in the foundation resulting from the geotechnical report – the latter is fixed in the contract in advance at unit prices.

    When can I move into a brick house, and what should I watch out for in the first years?

    You can move in as soon as the occupancy permit is issued, but a masonry house is a wet construction method: the concrete, the plaster and the screed bring in several thousand litres of water, so the screed needs about 1 week of drying per cm (5–6 weeks before tiling at 6 cm), and the interior plaster 2–4 weeks before painting. In the first winter we recommend short, intensive airing several times a day or heat-recovery ventilation. In the first 1–2 years, hairline cracks appearing in the corners are normal, and we repair them under the warranty. Every 5–10 years, the façade, the flashings, the silicone joints and the annual servicing of the mechanical systems are due; the masonry and the floor slabs themselves have a service life of 100+ years.

    Can you build in brick in winter too, or will the deadline slip?

    Yes, if it is well scheduled. We plan the structural work and the roof so that the house is under cover by autumn, so the interior work – mechanical, electrical, plastering, plasterboard, tiling – continues through the winter. On frosty days we suspend bricklaying, concreting and façade work or carry them out with winter-grade methods; under a fixed-price contract the weather risk is ours, not yours. The turnkey lead time – brick 8–16 months, YTONG 8–14 months – is fixed in the contract in calendar days.

    Request a quote

    Request a quote for your brick or YTONG house

    An itemised turnkey quote based on your drawings, with the package you choose – or a free consultation.

    • Reply within 1 business day
    • Itemised cost estimate
    • Fixed price, fixed deadline, warranty