Home Renovation
Renovation – overviewApartment renovationHouse renovationShop, office, restaurant
House building
House building – overviewBrick / YTONG houseSIP panel house
References About Blog Client portal Request a quote +36 30 366 0936

info@telehome.hu · 20+ years of professional background

Bathroom Renovation in Budapest
Bathroom Renovation

Bathroom renovation and modern bathroom solutions

The bathroom is the room you use every single day. TeleHome delivers the whole project, from design and demolition to a finished bathroom ready to use.

Bathroom Renovation

Bathroom renovation done properly

Your day starts and ends in the bathroom, so how it feels to walk in matters. A well-planned bathroom renovation is about far more than looks: the tiling, plumbing, lighting, storage and small details together create a quality that lasts. TeleHome takes on the complete job as a single contractor, from the first sketch through demolition to a finished, fully working bathroom.

  • Design, demolition, plumbing and tiling under one roof
  • A dedicated project manager coordinates every trade
  • Waterproofing and services renewed, not just the visible finishes
  • Solutions for small bathrooms and prefab panel apartments
  • Fixed-price quote with an itemised budget
Bathroom Renovation in Budapest | TeleHome
Outstanding20+ years of professional background
How we work

How it works

Every step is designed to protect the quality and durability of the finished result.

  1. 01

    Design and concept

    Every good bathroom renovation starts with a considered plan. We take into account the space available, the existing water and drainage points, the electrical system and how your household actually uses the room. A precise plan avoids compromises later: at this stage we decide where the basin goes, what the furniture will be, which type of heating is installed and how the lighting is laid out.

  2. 02

    Furniture and storage

    The right bathroom furniture is what keeps the room tidy. A well-sized vanity unit or a complete furniture set is both attractive and practical. Wall-mounted shelves give a lighter look, while base cabinets hide everyday items. Small bathrooms get special attention, because every centimetre counts: floating furniture, light-coloured tiles and a well-placed mirror all make the space feel bigger.

  3. 03

    Basins, mirrors and taps

    The basin and its matching tap are the elements you use most. The right size, ergonomic placement and water-saving operation all matter. A well-chosen mirror with suitable lighting is practical and sets the mood: bathroom lighting needs to be functional and pleasant at the same time.

  4. 04

    Tiles and design

    Tiles and wall finishes define the overall look more than anything else. Modern bathrooms often use large-format tiles, calm colours and natural textures. When choosing, durability and slip resistance count as much as appearance. Precise workmanship is critical here, because the quality of the waterproofing and grouting determines the condition of the bathroom for years to come.

  5. 05

    Panel apartments and special cases

    Renovating a bathroom in a Hungarian prefab panel apartment usually means working within fixed technical constraints. The tight footprint, predetermined service points and limited scope for structural change make careful planning essential. The right door, compact furniture and clever lighting make a big difference to how spacious the room feels. If there is a window, its insulation and moisture management are key to long-term performance.

  6. 06

    Services and comfort

    Heating is a basic comfort question in any bathroom renovation. Whether a heated towel rail or underfloor heating is the better choice depends on the property. In a properly planned renovation the water pipes, drains, electrical points and waterproofing are renewed too, not just the visible finishes.

References

Bathrooms we have renovated

Frequently asked questions

Frequently asked questions

How long does a bathroom renovation take?

A complete bathroom renovation usually takes 2–4 weeks. The exact time depends on how much demolition is needed and how extensively the plumbing is changed.

Do you strip the bathroom back completely?

Yes, if required we demolish everything back to the base surfaces. This is what makes the new work durable and safe in the long run, especially when new tiling is laid.

Can you help with the design?

Yes. We advise on layout and technical questions with the aim of a practical, good-looking result, and we help you choose tiles and finishes.

Who coordinates the different trades?

A project manager runs the job and coordinates the tiler, plumber, electrician and other specialists. You never have to organise the trades yourself.

Can I get a fixed price?

Yes. After a detailed survey we provide a fixed-price quote with an itemised budget, so your costs are known in advance.

How much does a bathroom renovation cost in 2026?

The final amount is driven by three things: the depth of the plumbing work (replacing fittings only, or the complete water, drainage and electrical systems), the price category of the tiles and sanitaryware (there is a manifold difference between HUF 8,000/m² ceramic tiles and HUF 40,000–60,000/m² porcelain stoneware), and the extent of any layout changes. A complete bathroom renovation in Budapest, from demolition to finished state, is typically a multi-million-forint item on the market; after an on-site survey we give you an itemised cost estimate in which the materials budget appears on a separate line, so you know exactly where you can save.

In a panel-block bathroom, can the bath be replaced with a shower, and can the toilet be moved?

A bath-to-shower swap is possible in a panel block too, even with a walk-in shower sunk to floor level with a floor drain, provided the fall of the drain allows it – we check this at the survey. Moving the toilet and the drains depends on the position of the riser: the panel-block wet unit is cramped and the riser cannot be moved, so the sanitaryware can only be shifted a limited distance. We usually demolish the old prefabricated panel bathroom wall completely and rebuild it with a plasterboard lining wall and moisture-resistant boards.

Why is waterproofing compulsory before tiling, and how is it done?

Tiles and grout are not watertight: around the shower, water seeping through the wall and floor soaks the screed and the neighbour below if there is no waterproofing underneath. In every bathroom we apply a liquid waterproofing membrane in two coats on the floor and on the wet walls up to shower height, and we seal the corners and the pipe and drain penetrations with system-matched sealing tape and collars. We photograph the hidden work and it forms part of the handover documentation – this is the basis of the guarantee.

In an apartment building, what needs to happen if the riser has to be replaced or the water shut off?

The riser (the vertical supply pipe) is common property: we agree its replacement with the building manager and notify the neighbours, because the water shut-off and the penetration through the floor slab affect them too. Often the solution is to replace the branches within your own apartment and the old, clogged lead or steel pipes. We fix the day of the shut-off in the schedule in advance, and we plan the wet room so that it is out of use for the shortest possible time.

Can I use the toilet and the shower during the renovation?

In a full bathroom renovation the room cannot be used from demolition until the tiles are grouted – typically 2–3 weeks; if there is a separate toilet in the apartment, we leave it working until the end of the job. If there is not, we agree a temporary solution (refitting the toilet pan outside working hours, a portable solution). The sanitaryware is fitted in the last few days; after siliconing it needs 24 hours to cure, and then it can be used.

Request a quote

Request a no-obligation quote

On-site survey, itemised cost estimate, fixed deadline and warranty – we reply within 1 business day.

  • Reply within 1 business day
  • Itemised cost estimate
  • Fixed price, fixed deadline, warranty
No obligationMon–Fri 8:00–18:00 · info@telehome.hu