Home Renovation
Renovation – overviewApartment renovationHouse renovationShop, office, restaurant
House building
House building – overviewBrick / YTONG houseSIP panel house
References About Blog Client portal Request a quote +36 30 366 0936

info@telehome.hu · 20+ years of professional background

Modern kitchen after a TeleHome renovation
Apartment renovation in Budapest and Pest County

Apartment and house renovation with reliable tradespeoplewith an itemised cost estimatewith a fixed deadlinewith a guarantee

Apartment, family house or commercial property – full and partial renovation from one contractor: on-site survey, itemised cost estimate, fixed deadline, guarantee.

Why choose us?

Reliable workmanship, without compromise

M&M TeleHome Kft. provides high-quality apartment renovation and general contracting services in Budapest and Pest County. From smaller renovations to complete apartment projects, we carry out every job with the same thoroughness.

We believe that successful building work rests on detailed planning, fair communication and a team of excellent tradespeople. The aim of every project is that our clients remain satisfied with their finished home in the long term.

  • Real referencessatisfied clients you can check with
  • Guarantee on all our workfixed in the contract
  • Itemised, transparent pricingyou see exactly what you spend on what
  • Our own teamnot casual subcontractors
Our servicesApartment renovation – every trade from one contractor
  • Condition survey and cost estimate
  • Full apartment renovation from one contractor
  • Bathroom renovation
  • Tiling and flooring
  • Painting and skimming
  • Drywall installation, suspended ceilings
  • Thermal, sound and damp insulation
  • Window and door replacement and fitting
  • Electrical installation, fittings
  • Plumbing, gas and heating
  • Demolition, rubble removal
  • Kitchen preparation and fitting
150+completed renovation projects
Process

How an apartment renovation works

Five transparent steps from the first call to handing over the keys.

1

Getting in touch

By e-mail, by phone or through the quote request form.

2

On-site survey

Condition survey and expert advice on site.

3

Cost estimate

An itemised, detailed quotation is prepared.

4

Contract

With a fixed deadline and a recorded technical specification.

5

Construction

A coordinated team, continuous communication, handover.

Survey fee: within Budapest HUF 20,000 + VAT, outside Budapest (within 20 km) HUF 30,000 + VAT – it includes the itemised, detailed cost estimate, and we credit it if you accept our quote.
Apartment renovation prices 2026

How much does an apartment renovation cost in Budapest in 2026?

The honest answer: it depends on what we renovate and to what standard. The ranges below are indicative figures drawn from public price guides for the Budapest market and from our own experience – in every case we give a price after an on-site survey, in an itemised, detailed cost estimate.

Type of renovationWhat it typically includesMarket range (gross, materials + labour)For a 60 m² apartment
Partial / cosmeticSkimming, painting, new flooring, fittings, internal doors; plumbing, heating and electrics stay as they areapprox. HUF 100,000–200,000/m²approx. HUF 6–12 million
Full apartment renovationDemolition, complete replacement of the water, drainage and electrical systems, subfloor, drywall, bathroom, kitchen preparation, tiling and flooring, painting, fittingsapprox. HUF 200,000–400,000/m²approx. HUF 12–24 million
PremiumAs the full renovation, plus interior designer, bespoke furniture and finishes, underfloor heating, air conditioning, smart home, window and door replacementabove HUF 400,000/m²above HUF 24 million

What drives the price per square metre?

Mostly how deep the plumbing, heating and electrical work goes: if the entire systems are replaced, that is 25–35% of the cost.

  • Next come the bathroom and the kitchen, where the choice of tiles and sanitaryware is decisive.
  • Painting and flooring are the easiest items to plan.

The effect of material choices

The same work gives a different total with porcelain tiles at HUF 40,000–60,000/m² than with ceramic tiles at HUF 8,000/m².

How we handle itThat is why our itemised, detailed cost estimate lists materials and labour on separate lines – you see exactly where you can save and where it is not worth it.

What to keep a reserve for

In older Budapest apartments the true condition of the walls, the subfloor and the concealed pipes and cables only becomes clear after demolition.

How we handle itWe uncover most of the risks in advance at the survey, but it is worth treating 10–15% of the total as a reserve – this too is part of the contract, not a surprise.

Important: the figures above are indicative market values, not a TeleHome quotation. With us, the price is prepared after an on-site survey (HUF 20,000 + VAT in Budapest, HUF 30,000 + VAT within 20 km, credited if you accept our quote), in an itemised, detailed cost estimate that is an annex to the contract – together with the fixed deadline and the guarantee. How the survey and the cost estimate are prepared →
Comparison

General contractor or a self-managed renovation?

Many people set out thinking “I'll round up the tradespeople myself, it will be cheaper”. Sometimes it really is – but the difference is mostly not in the price, but in the risk and in your time. This is how the two routes look side by side.

AspectSelf-managed renovation (separate tradespeople)TeleHome general contracting
Quotation5–8 separate quotes with differing content, hard to compareOne itemised, detailed cost estimate for every trade
Contract and responsibilitySeveral contracts or none; when something goes wrong, everyone points at someone elseOne contract, one party responsible for the whole job
SchedulingYou coordinate the tradespeople; one delay pushes back all the othersA project manager draws up the schedule and keeps to it
DeadlineA well-meant estimate, with no penaltyA fixed deadline recorded in the contract
Purchasing materialsYou order, arrange delivery and handle complaintsWe order them on schedule, delivered to site
Concealed work (electrics, water pipes in the walls)Often undocumented, a problem later onPhotographed and documented in the handover pack
GuaranteeTrade by trade, verbal or none at allOne contractual guarantee for everything
Your timeDaily presence, phone calls, decisions on siteA weekly meeting, decisions made in advance, one point of contact

Who do we not recommend general contracting to? If only a single trade is involved – just painting, for example, or replacing one window – a good tradesperson is often enough. But if three or more trades build on one another (demolition, plumbing and heating, electrics, tiling, painting), coordination becomes a job in its own right, and this is where general contracting brings the most.

Services

Every trade from one contractor

Click for details – for every service we describe the work process and answer the frequently asked questions.

References

Renovation references

Our apartment, house and commercial renovations in one place – from the kitchen to the façade.

12 / 145
Panel, brick, period

How does renovating a panel apartment, a brick apartment and a period apartment differ?

Budapest's three typical apartment types are three different technical tasks. Over our team's more than twenty years of experience we have been through all three on more than 150 projects – these are the things we look out for at the survey.

Guarantee

Guarantee on your apartment renovation

  • A guarantee fixed in the contract on all the work carried out
  • The manufacturer's warranty on built-in materials and appliances – we hand over the paperwork in good order at handover
  • After handover you deal with the same project manager who led the works
Financing

Grants and loans in 2026

  • Budapest applications to the energy-focused Home Renovation Programme were suspended in spring 2026; the Rural Programme applies only to small settlements
  • There is currently no targeted non-repayable grant for apartments in Budapest; the Wekerle Plusz energy renovation grant announced for 2027 may change this
  • Financing from a mortgage, a personal loan or a home savings plan – our itemised cost estimate is accepted by banks
Current grants? Ask us – we keep track of the changes.
FAQ

Frequently asked questions before an apartment renovation

How much does an apartment renovation cost in 2026?

The price of a full renovation depends on the condition of the apartment and the technical specification; so instead of quoting a price per square metre, we prepare an itemised, detailed cost estimate after an on-site survey, listing every type of work and every material. The final amount is part of the contract – there are no hidden costs.

How much is the survey fee?

Within Budapest HUF 20,000 + VAT, outside Budapest (within 20 km) HUF 30,000 + VAT. The fee includes preparing the itemised, detailed cost estimate, and we credit it if you accept our quote.

How long does a full apartment renovation take?

An apartment or house renovation typically takes 4–16 weeks from demolition to handover (depending on size and technical specification), and a bathroom renovation 2–4 weeks. We give you the exact schedule after the survey and fix it in the contract.

Do I need to find separate tradespeople?

No. As a general contractor, every trade is coordinated by our own well-practised team and one project manager. You have a single point of contact.

Can I live in the apartment during the renovation?

For a partial renovation, yes; for a full renovation we do not recommend it during the demolition, plumbing and heating, and tiling phases. We draw up the schedule so that the apartment is uninhabitable for the shortest possible time.

How does renovating a prefabricated panel apartment differ from renovating a brick-built one?

In a panel apartment the wet rooms are built around the service riser and the prefabricated panels: the walls cannot be chased freely, relocating the bathroom is limited, the electrical cables run in the floor-slab ducts, and replacing a riser shared with the neighbours requires separate coordination. A brick apartment gives you more freedom with the floor plan, but the old subfloor, the plaster and rotten timber ceilings often hold surprises. In a period apartment the 3.5–4 metre ceiling height, the long service runs and the listed façade set the direction. We have renovated all three apartment types on more than 150 projects in Budapest, so at the survey we look specifically at these points.

Do I need the permission of the apartment building or the building manager for an apartment renovation?

No permit is needed for renovation work within your own apartment (tiling, painting, electrical, mechanical and plumbing work), but work affecting common property – risers, load-bearing walls, replacing façade windows, balconies – requires the consent of the apartment building or a resolution of the general meeting, and the house rules regulate when noisy work may be carried out. Before starting, we coordinate with the building manager, register the work, and we take care of protecting the lift and the stairwell and of placing the skip. Details on the blog: apartment renovation in an apartment building.

How is payment made for an apartment renovation – how large is the deposit?

You pay the contractor's fee in instalments tied to the itemised cost estimate and the schedule, not in a single sum up front. On signing the contract, the deposit covering material purchases and the start of work is due; the further instalments follow the certified completion of the work phases (demolition and mechanical work, tiling, finishing work), and the final invoice is due after handover and the closing of the snag list. You can also see the payment schedule and every interim invoice on the client portal.

Who orders the materials, and can I bring my own tiles or sanitaryware?

We order the building materials (plasterboard, screed, adhesive, pipes, cables), scheduled and delivered to the site – these appear as separate lines in the itemised cost estimate. The visible elements – tiles, porcelain stoneware, parquet, sanitaryware, taps, interior doors – can be chosen from our suppliers within a materials allowance, or you can bring your own; in that case we agree on the quantities and delivery dates so that the work is not held up. The cost of the renovation depends heavily on these: the same job with HUF 8,000/m² tiles and with HUF 40,000–60,000/m² porcelain stoneware gives a different final total.

What happens if a hidden defect comes to light after demolition?

In old Budapest apartments, the true condition of the subfloor, the walls and the concealed wiring only becomes visible after demolition. At the survey we uncover most of the risks in advance (moisture measurement, electrical system, pipes), but it is wise to treat 10–15% of the final total as a reserve. If something does turn up – a rotten floor joist, aluminium wiring, a faulty drain – we document it with photos, price it in advance in writing, and only carry out the work after your approval. We never charge extra afterwards for the technical content fixed in the contract.

Request a quote

Ask for a no-obligation quote

From a bathroom to the whole apartment: survey, itemised cost estimate, fixed deadline, guarantee.

  • Reply within 1 business day
  • Itemised cost estimate
  • Fixed price, fixed deadline, warranty
No obligationMon–Fri 8:00–18:00 · info@telehome.hu