Home Renovation
Renovation – overviewApartment renovationHouse renovationShop, office, restaurant
House building
House building – overviewBrick / YTONG houseSIP panel house
References About Blog Client portal Request a quote +36 30 366 0936

info@telehome.hu · 20+ years of professional background

SIP panel house
turnkey,
in as little as 4–6 months.

Design, manufacture and construction of certified, energy-efficient SIP family homes, from a Hungarian manufacturer. At an affordable price and with a short lead time.

36 standard house designs
25 years system warranty
A++ energy class
MgO SIP panel Nail-plate roof trusses Energy-efficient

A unique, system-level building technology

We build with the certified building elements developed in-house by our contracted partner. The walls, the roof structure and the build-up all come from a single source — this is the key to our being able to take responsibility at system level.

Downloadable material

Product brochure & technical description

Get to know MgO graphite SIP technology in detail: build-ups, technical data, fire-protection and thermal-insulation parameters — in a single downloadable PDF.

PDF TeleHome SIP Brochure PDF document · in Hungarian
Download (in Hungarian)
01

Outstanding fire resistance

The MgO boards withstand 1,300 °C for 180 minutes. The MgO facing is fire class A1–A2 (MSZ EN 13501-1) — a non-combustible rating that protects the graphite EPS core on both sides.

02

Top-class thermal insulation

The thermal conductivity of the graphite EPS core is approx. 0.031 W/mK, while the MgO graphite build-up reaches passive-house level (U ≤ 0.11 W/m²K) — one of the best values on the Hungarian market.

03

System warranty from a single source

The wall and roof structure and the complete build-up come from the same manufacturer. ÉMI and EOTA approvals for the wall and roof structure — a real, documented technical warranty.

04

Environmentally friendly materials

Free of chloride, formaldehyde and VOCs, manufactured with low CO₂ emissions. Biologically stable: it does not go mouldy, is antibacterial and does not shed dust.

Approvals

Approvals and certificates

Our buildings are not only stable and modern but also officially certified. The ÉMI and EOTA approvals apply to both the wall and the roof structure — a real technical warranty backed by documented tests and certifications.

ÉMI approval EOTA approval MSZ EN 13501-1 · A2
MgO graphite SIP panel

An environmentally friendly, energy-saving panel

Graphite MgO SIP technology not only meets the latest building trends but also forms the basis of sustainable construction — a responsible choice for the future.

  • Contains no chloride, formaldehyde or VOCs
  • Manufactured with low CO₂ emissions
  • Biologically stable — it does not go mouldy and does not attract rodents
  • Withstands extreme weather
  • Sheds no dust, causes no irritation — has an antibacterial effect
  • Passive-house-level thermal insulation (U ≤ 0.11 W/m²K)

Environmentally friendly, fire-safe, economical and comfortable all at once — a considered decision that pays off in the long term.

Roof structure

As part of the system warranty

Our partner manufactures not only SIP panels but also nail-plate roof trusses of its own design and production. The system warranty on the house structure can only be enforced if every structural element comes from the same manufacturer.

As part of the MASTERSIP system, we supply individually, structurally engineered, factory-prepared building elements for every house — we take care of the design, manufacture and delivery in full.

  • Guaranteed short lead time
  • Fault-free fitting on site
  • A system warranty for the whole house
  • No waiting on other manufacturers’ delays — the house is never left without a roof
Foundations

Solid foundations, engineered to the structural design

The house is built on a standard strip foundation as specified by the structural engineer. From the precise earthworks to the blinding slab, we build every layer ourselves — this is the basis of a long service life and a stable structure.

  • Strip foundation excavated 90 cm deep and 40 cm wide, with the reinforcement specified by the structural design
  • Plinth built one course high from 20 cm shuttering blocks
  • One 8 mm horizontal reinforcing bar between the shuttering blocks
  • Plinth insulated with 5 cm graphite XPS insulation
  • Laying of the waste-water pipes
  • Compacted backfill
  • Blinding slab cast 12 cm thick
  • Reinforcement: 6 mm steel mesh at 15×15 cm spacing
Thermal insulation

Graphite thermal envelope — layer by layer

The entire thermal envelope of the house is built with graphite technology: a uniform, high-performance system from the façade through the plinth to the floor.

  • Façade: with stress-relieving slits on its surface that also improve adhesion — a Konstruma award-winning product
  • Plinth: the grid-like, stress-relieving slits on its outer face prevent the stresses caused by environmental effects, so a structure free of distortion and deformation can be created, with excellent render adhesion
  • Floor: graphite EPS 150 load-bearing floor insulation

And, of course, the SIP panel.

Build-ups

Precise internal build-ups — ceiling, walls, partitions

Every surface is built with the appropriate build-up: vapour barrier, acoustic and fire-rated plasterboard lining, with careful joints and edge protection.

  • A reflective SD150 vapour-barrier membrane is fixed to the ceiling structure
  • Suspended ceiling on a 60 mm CD-profile steel frame
  • 12.5 mm BLUE ACOUSTIC fire- and sound-rated plasterboard
  • 60×60 cm metal access hatch (without ladder)
  • ROTHOBLAAS airtightness tape on the internal joints of the main walls
  • 3 cm Bramac battens (air gap)
  • 1 layer of 12.5 mm BLUE ACOUSTIC fire- and sound-rated plasterboard lining
  • 1 layer of 1.25 cm fire-rated plasterboard lining on each side of the partition walls
  • Corner beads are used on the edges

SIP panels and traditional construction compared

Feature
MgO graphite SIP TeleHome
30 cm brick + 10 cm insulation
30 cm YTONG + 10 cm insulation
Build time (turnkey)
~4–6 months
8–16 months
8–14 months
U-value (wall)
≤ 0.11 W/m²K
~0.22 W/m²K
~0.16 W/m²K
Wall thickness (for the same U-value)
~24–28 cm
~44–46 cm
~44–46 cm
Energy class
A++ (up to passive house)
A – A+
A+
Fire resistance
A1–A2 · 1,300 °C · 180 minutes
A1 (non-combustible)
A1 (non-combustible)
Airborne sound insulation (Rw)
~50–60 dB
~48–52 dB
~44–48 dB
Moisture / mould
100% waterproof, mould-free
good (protected by render)
highly absorbent
Self-weight / foundations
lightweight · smaller foundations
high self-weight
medium self-weight
CO₂ footprint (manufacturing)
~50% lower
high
medium
Warranty / certification
Full system warranty ÉMI/NME · EOTA/ETA · PHI
structural warranty
structural warranty

Choose the home of your dreams

All our models are A++ energy class, at a turnkey price — with a full service covering the plot, the foundations and the construction.

0 house types

How does your home come to life?

A simple, transparent process — from the first consultation to the handover of the keys.

1
1 week

Free consultation

Discussing your needs, presenting the options, preparing a personalised, detailed quote and signing the contract.

2
2–4 weeks

Design, permits

Our partner designers prepare the individual plans according to the requirements agreed in advance, or adapt the chosen standard house design to the local regulations. The permit process begins – simple notification: 2–4 weeks, building permit: 2–4 months.

3
4–6 weeks

Manufacturing, foundations

Our Partner starts its own manufacturing processes in Hungary. During production, we begin and complete the foundation works on site, ready to receive the structure.

4
2–4 weeks

Delivery, structural assembly

We deliver the finished elements (main walls, roof structure, partition walls) to the site and erect the structure with the help of cranes. Depending on the size and type of the house, this takes a few days. The house is now almost at structure-only stage.

5
2–4 months

Turnkey handover

The roof covering, the installation of the external windows and doors and the electrical and building-services first fix get under way, and the external and internal finishing works can begin. A few months later the new home is ready to move into.

Homes we have built

See how our real SIP panel houses are built — from the delivery of the panels to the finished structure. Click on the pictures to enlarge them.

Frequently asked questions

The most common questions about SIP technology and the process.

Will the house be finished in 4–6 months?

Yes, the turnkey construction of an average single-storey SIP family home of around 100 m² can be completed in 4–6 months.

What is an MgO graphite SIP panel?

An MgO graphite SIP panel is a modern building element consisting of two high-strength magnesium-oxide (MgO) boards and a high-density graphite EPS insulating core. The structure provides excellent thermal insulation, high load-bearing capacity and fast construction all at once. The MgO facing resists moisture, mould and pests, so it is a reliable long-term solution for building energy-efficient family homes.

How energy-efficient is an MgO graphite SIP house?

One of the greatest advantages of SIP technology is its excellent thermal insulation and minimal thermal bridging. The panels, manufactured to a high degree of precision, form an airtight structure, which reduces the energy needed for heating and cooling. With suitable building services – a heat pump, for example – extremely low running costs can be achieved.

Are MgO graphite SIP panels durable?

Yes. MgO boards have high mechanical strength, resist moisture, do not rot or go mouldy and, when properly installed, offer a long service life. The panels are made as load-bearing structural elements, so they meet modern building requirements.

Can a two-storey house be built from SIP panels?

Yes. SIP technology is suitable not only for single-storey homes but also for two-storey family houses, semi-detached houses and other residential buildings. With the right structural design, the system can be used safely over several storeys.

In what ways is SIP technology better than a traditional brick house?

The main advantages of SIP houses include faster construction, excellent thermal insulation, fewer thermal bridges, precise factory prefabrication and lower energy consumption. In addition, less waste is produced during construction, and the weather has less influence on the pace of the work.

Can I use a loan or a state subsidy to build a SIP house?

Yes. Provided the building has the necessary plans and permits and meets the legal requirements in force, it can be financed by a bank loan or by the state home-creation schemes currently available, just like a traditionally built family house. Eligibility always depends on the conditions of the particular subsidy scheme.

Why is it worth choosing a general contractor?

With general contracting, a single company is responsible for the entire building process, so the client does not have to coordinate the separate trades. This means simpler administration, better organisation, more predictable deadlines and a single point of warranty responsibility, which greatly reduces the stress that comes with building a house.

Are the MgO SIP panels certified?

Yes. The MgO graphite SIP panels we use have the technical documentation and certifications required for their distribution and installation. The performance of the panels is confirmed by laboratory tests covering, among other things, thermal insulation, mechanical strength and fire protection. On request, we make the related documentation available to our clients.

What happens if I have a warranty issue later on?

If you report a warranty issue, our colleagues will contact you, examine the report and, where the warranty claim is justified, carry out the necessary repairs as quickly as possible. For us, handing over the house is not the end of the relationship but the start of a long-term client relationship.

How does an MgO SIP panel differ from a traditional OSB SIP panel?

The MgO facing is more resistant to moisture, mould and fire than traditional OSB board. It is also more dimensionally stable, does not swell when exposed to moisture, and provides excellent structural stability in the long term.

How much does a turnkey SIP panel house cost in 2026, and what does the price include?

A turnkey SIP house starts from net HUF 500,000/m², for floor areas above 90 m², with an A++ energy rating. The price covers a complete, modern technical specification: a structurally designed strip foundation, MgO graphite SIP walls and a nail-plate roof truss from a single manufacturer, heat-pump underfloor heating, triple-glazed, high-insulation uPVC windows and doors, a fire- and sound-resistant plasterboard build-up, floor and wall finishes, painting, sanitaryware – right up to the occupancy permit. The online price calculator gives you an indicative price in minutes; as options you can choose heat-recovery ventilation (+HUF 2.49 million), solar panels (approx. 5 kWp, +HUF 2.25 million), smart home, air conditioning, terrace and paving.

How well soundproofed is a SIP house – won't every sound come through, as in a lightweight house?

The airborne sound insulation of the MgO graphite SIP wall structure is ~50–60 dB, which matches or exceeds that of a 30 cm brick wall (~48–52 dB) and YTONG (~44–48 dB). The layer build-up adds to this: an air gap in the main walls, 12.5 mm BLUE ACOUSTIC fire- and sound-resistant plasterboard, two-sided fire-resistant boarding on the partition walls, and a vapour barrier membrane and an acoustic suspended ceiling on the floor slab. We have gone through the myths about lightweight houses – including sound transmission – on the blog: 10 myths about lightweight houses.

Won't a SIP house get too hot in summer if it has no thermal mass?

The thermal mass of a SIP house is indeed lower than that of a brick house, but passive-house-level insulation (U ≤ 0.11 W/m²K) keeps the summer heat out as well, and the house responds quickly to the building services. That is why we handle summer comfort as a system: heat-pump underfloor heating in cooling mode or air conditioning, external shading (roller shutters, screens) on the south- and west-facing glazing, and heat-recovery ventilation with a summer bypass. In a well-oriented, shaded SIP house, the air conditioning consumes a fraction of what it takes to cool an uninsulated house in summer.

Can a SIP house be modified later – moving a wall, fixing shelves or kitchen units?

The floor plan is decided on the drawing board: the panels arrive structurally designed and individually manufactured, so relocating load-bearing walls afterwards does not work the way it does in a masonry house – we finalise any changes before production. Fixing things, on the other hand, is simple: the MgO board and the plasterboard build-up have a high load-bearing capacity, so kitchen units, shelves, TV brackets and water heaters can be fixed without any problem using suitable wall plugs, and the service runs are routed in the ducts formed during production. An extension, a terrace or a loft conversion can also be designed for the system later.

Should I choose a standard house design or ask for a custom design?

Both are possible, with the same technology. The 36 standard house designs start from ready-made, proven floor plans, with faster design and a predictable price – our partner designers adapt them to the local regulations (local building code, roof pitch, orientation). With a custom design, the floor plan is drawn up to your requirements and then structurally designed by the manufacturer; the lead time may be 2–4 weeks longer. In both cases the turnkey lead time can be as little as 4–6 months: 2–4 weeks of design, 4–6 weeks of production and foundation work, a few days of structural assembly with a crane, then 2–4 months of finishing work.

Calculate the price of your home

Tell us what you need and we will send you an indicative quote within minutes.

1 Choose a standard house design

2 Level of completion

3 Optional extras

4 Your details

Indicative net price A++ energy class
— HUF · from
The turnkey price covers a complete, modern and energy-efficient specification, with heat-pump underfloor heating, triple-glazed uPVC windows and doors with enhanced thermal insulation, white inside and out, and the technical solutions needed to reach the A++ energy level.
To request a quote, you must accept the Privacy Policy.

* Indicative price; please contact us for an exact quote.