Home Renovation
Renovation – overviewApartment renovationHouse renovationShop, office, restaurant
House building
House building – overviewBrick / YTONG houseSIP panel house
References About Blog Client portal Request a quote +36 30 366 0936

info@telehome.hu · 20+ years of professional background

General contracting – TeleHome
General contracting

General contracting – apartment renovation and house building in one hand

One main contractor, one accountable party, one contract. We explain what general contracting means, what it costs and what to check before you sign.

What are general contracting and turnkey construction?

General contracting: the general contractor covers the entire process of the building project. One main contractor directs the works and is responsible for design, permits and the various stages of construction – including managing the subcontractors. You do not have to coordinate separate trades.

Turnkey construction: at the end of the build the client receives a fully finished property that is ready to move into. This includes the interior fit-out, painting, tiling and flooring and all other finishing work, so all the client has to do is move in.

The general contracting process

1. Design and permits

Working out the floor plan and the drawings, selecting materials, obtaining quotes, and the permit procedure needed to start construction lawfully. For house building, the choice of technology – brick/YTONG or SIP panel – is also decided here.

2. Preparatory works

Fencing off the site, establishing utilities, site levelling, foundations and other preparations.

3. Construction stages

  • Foundations and structural works
  • Waterproofing
  • Installing windows and doors
  • Building internal partition walls
  • First-fix building services and electrics
  • Building up the floor and wall layers
  • External and internal plastering, insulation
  • Interior finishes (tiling and flooring, painting)
  • Fixtures and fittings

4. Finishing works and handover

In turnkey construction we hand over the building fully finished according to the client's requirements. This stage covers the final clean, the correction of defects and obtaining the occupancy permit.

Prices and costs

Prices depend heavily on the type of work, the building materials, the complexity of the project and the size of the building. For house building, turnkey construction with traditional technology starts from net HUF 650,000/m²; with SIP panel technology from HUF 500,000/m² (above 90 m²). For apartment renovation we prepare an itemised, detailed cost estimate after a personal survey.

Important: the word “turnkey” means something different at every company. Two quotes can differ by as much as ten million forints simply because of what was left out of one of them. With us, the itemised specification is an annex to the quote and part of the contract. Read more: What does a turnkey price include?

What should you look for when choosing a general contractor?

  • Reliability and references – ask for references and look at completed projects.
  • Transparent cost estimate – the quote should be itemised and include every work stage.
  • Deadlines and scheduling – a fixed schedule and a past performance you can verify.
  • Warranty and quality assurance – a warranty on the completed work, undertaken in the contract.

Why choose us as your general contractor?

  • Precise deadlines – we pay close attention to scheduling, and the deadline is part of the contract.
  • Detailed cost estimate – transparent, itemised, with no hidden costs.
  • Warranty and quality assurance – we give a warranty on all our work; Complaint-Free Construction Certificate (AAA).
  • Real references – we are proud of our completed projects.
  • Our own team – tradespeople used to working together, one project manager.
FAQ

Frequently asked questions

What is the difference between general contracting and turnkey construction?

A general contractor covers the entire process of a building project and is responsible for it; turnkey construction is the end product of this: a fully finished property that is ready to move into.

How much does general contracting cost?

For house building it starts from net HUF 650,000/m² with traditional technology; for apartment renovation we prepare an itemised, detailed cost estimate after a survey.

What should I look for when choosing a general contractor?

References, an itemised cost estimate, a deadline fixed in the contract, warranty, continuous communication. TeleHome holds a Complaint-Free Construction Certificate (AAA).

Is general contracting more expensive than organising the tradesmen myself?

The final total is usually not higher, because we buy materials at trade prices, on schedule, and sequencing mistakes (damaged fresh paint, tiling removed twice) are avoided. What general contracting includes and self-organising does not: one itemised cost estimate covering every trade, one contract with a fixed deadline, one project manager who keeps the 5–8 trades on schedule, and one party responsible for the warranty. With three or more interdependent trades this brings the most value; for a single trade we will honestly tell you that one good tradesman is enough.

Do you work with your own team or with subcontractors?

With our own well-established team and permanent trade partners who have worked with us for years – not with casual tradesmen found through adverts. Every trade is coordinated by the same project manager, and M&M TeleHome Kft. is responsible for quality and deadlines under one contract, regardless of who carried out the particular work. If there is a problem in any trade, you do not have to find out who is at fault – we fix it.

Do I need to hire a separate technical inspector if I work with a general contractor?

For house building and permit-requiring conversions, a responsible technical manager on the contractor's side is mandatory – we provide this – while on the client's side a technical inspector may be required by the bank or the subsidy scheme, and we recommend one anyway for larger projects: an independent pair of eyes when certifying interim invoices. For an apartment renovation it is not mandatory; with us, the photo documentation and the client portal provide transparency, but we are also happy to work with an external inspector.

Do you keep an electronic construction log, and who is the responsible technical manager?

Yes, for every permit- or notification-requiring job (house building, extension, loft conversion, adding a storey) we keep an electronic construction log, we provide the responsible technical manager and the contractor's liability insurance, and we arrange the activation of the log together with the designer. Progress is certified with photo entries – this is also the basis for bank disbursements and grant applications. For an apartment renovation an electronic log is not mandatory, but the same documentation is produced on the client portal.

What is the Complaint-Free Construction Certificate, and why does it matter?

It is an independent rating certifying that there are no registered consumer complaints against the contractor and that the company is in good financial and legal standing – AAA is the highest level of trust. We have held it since 2025 (the 2025–2026 and 2026–2027 certificates can be downloaded from the footer of the site). When choosing a contractor, it is worth looking at this together with the company register, verifiable references and Google reviews.

Request a quote

In one hand, with one accountable party

One contract, one accountable party, a fixed price and deadline – request a quote for a renovation or for building a house.

  • Reply within 1 business day
  • Itemised cost estimate
  • Fixed price, fixed deadline, warranty
No obligationMon–Fri 8:00–18:00 · info@telehome.hu