Home Renovation
Renovation – overviewApartment renovationHouse renovationShop, office, restaurant
House building
House building – overviewBrick / YTONG houseSIP panel house
References About Blog Client portal Request a quote +36 30 366 0936

info@telehome.hu · 20+ years of professional background

Modern family house – request a quote
Request a quote

What would you like a quote for?

Choose the type of project and plan with the price calculator – we will get back to you within 1 working day with a detailed, no-obligation quote.

Step 1

Choose what we can help you with

FAQ

Frequently asked questions

What should I put in the quote request form so you can call me back quickly?

The type and address of the property (district or town), the floor area, the scope of the planned work (full or partial renovation, which rooms; for house building, whether you have a plot and plans), the desired start or completion date and, if you have one, a floor plan or a few photos. It does not have to be precise – we clarify the details at the on-site survey – but from this we can already give you an indicative price range and an appointment when we call back.

How long does it take to receive the quote?

We call you back within 1 working day and arrange an appointment; after the on-site survey the itemised, detailed cost estimate is typically ready within 5–10 working days, depending on size. For house building, a priced bill of quantities based on construction drawings may take longer. We send the quote by e-mail as a PDF and go through it item by item at a meeting.

Does requesting a quote or the survey commit me to anything?

Requesting a quote and the house-building consultation are free of charge and without obligation. The on-site condition survey is subject to a fee (HUF 20,000 + VAT in Budapest, HUF 30,000 + VAT within a 20 km radius), because it produces an itemised cost estimate that you can also use to compare other quotes; if you accept our quote, the fee is credited in full. If you do not continue with us, the cost estimate remains yours.

When can you come out for a survey, and how long does it take?

In Budapest and within a 20 km radius typically within 3–7 working days, on weekdays between 8 am and 6 pm, or early morning or late afternoon on request. The survey takes 1–2 hours; it is best if all the decision-makers are present and, if available, the floor plan, any previous plans or the apartment building's deed of foundation are to hand.

Can I request a quote if the property is not yet mine and I am only about to buy it?

Yes, and it is worth doing: a condition survey before purchase shows how much renovation the apartment or house needs, which is also the basis for negotiating the price and planning the loan. We visit at a time agreed with the seller, and the survey fee is the same. We wrote about the order of renovation work before moving in on the blog: apartment renovation after purchase.