Home Renovation
Renovation – overviewApartment renovationHouse renovationShop, office, restaurant
House building
House building – overviewBrick / YTONG houseSIP panel house
References About Blog Client portal Request a quote +36 30 366 0936

info@telehome.hu · 20+ years of professional background

Demolition and Strip-Out Services
Demolition

Apartment strip-out and building demolition: fast and complete

From small internal strip-outs to demolishing an entire house, everything is handled by one team, including rubble removal and skip hire.

Demolition

Demolition done properly

Professional demolition is one of the most important first steps of any build or renovation. A well-executed strip-out or demolition not only speeds up everything that follows, but creates a safe basis for the new layout. TeleHome provides a complete demolition service: from minor internal work to demolishing an entire house, everything is in one pair of hands, including rubble removal and skip-based waste disposal.

  • Full and partial apartment strip-outs and building demolition
  • Wall removal, bathroom strip-outs and internal alterations
  • Roof demolition, including asbestos-cement (slate) roofs
  • Skip hire and rubble removal organised for you
  • Clean, tidy site ready for construction to begin
Demolition and Strip-Out Services | TeleHome
Outstanding20+ years of professional background
How we work

How it works

Every step is designed to protect the quality and durability of the finished result.

  1. 01

    Demolition

    Demolition is not just knocking down walls; it is a carefully planned, safe and systematic process. Our services include complete apartment strip-outs, full building and house demolition, wall removal and internal alterations, bathroom strip-outs, and roof demolition, including old slate and asbestos-cement roofs. All demolition is carried out in accordance with the relevant safety and technical regulations.

  2. 02

    Roof and structural demolition

    Taking down a roof requires specific expertise, especially with older structures or special coverings. When removing slate or asbestos-cement roofs, a compliant and safe procedure is paramount. Demolition often goes hand in hand with preparing for a new roof, so we carry out the work in a way that lets construction of the new structure begin quickly.

  3. 03

    Rubble and waste handling

    One of the most important parts of demolition is dealing with the waste it generates. TeleHome does not just do the demolition; we manage the entire process of removing the building rubble, with fast rubble collection, reliable haulage and a full skip-based waste service. We always hand over the site clean and tidy.

  4. 04

    Skip service

    Efficient demolition depends on having the right skip on site. TeleHome helps you choose the right size and arranges prompt delivery: simple skip ordering, flexible placement and collection, and continuous removal on larger projects. That way the demolition can proceed without interruption.

  5. 05

    A complete solution

    TeleHome's aim is that demolition never becomes an extra burden for you. The whole job is handled by one team, from survey to disposal: carrying out the demolition, organising rubble removal, providing skips and clearing the site completely. The result is a clean, prepared site that is immediately ready for the new construction work to start.

References

Demolition projects

Frequently asked questions

Frequently asked questions

Do you take on full demolition?

Yes. We carry out both full and partial demolition, including apartments, family houses and smaller buildings, always to a professional standard.

Do you handle rubble removal?

Yes. We take care of removing and properly disposing of the building waste and hand over the site clean. It is part of the complete demolition service.

How long does demolition take?

It depends on the size and structure of the building. The internal strip-out of an apartment can be done in just a few days; the exact time is project-specific.

Do I need a permit for demolition in Hungary?

Demolishing an entire building typically requires a permit. Internal strip-out work usually does not, but in a condominium building it is advisable to coordinate with the building management first.

Is the demolition carried out safely?

Yes. The work is done professionally and in compliance with health and safety regulations, with particular care taken to protect the surroundings. This is a basic principle on every demolition job.

Who arranges the skip and the public-space use permit?

We do. We order the skip to match the schedule; in Budapest, for a skip placed on public land (pavement, parking lane) we also apply for the district's public-space use permit and the vehicle access permit, and the fee appears on a separate line in the itemised cost estimate. Where a skip does not fit, we use bagged rubble removal or collection in the inner courtyard; the rubble is taken to a licensed landfill with waste transfer documentation.

Do you also remove asbestos slate roofs?

Yes, with a partner licensed for asbestos removal: the slates are removed without breaking, wetted, in sealed bags and with protective equipment, and taken to a licensed hazardous-waste facility with a certificate. This costs several times more than conventional roof demolition, so we show it on a separate line in the roof renovation cost estimate. It is worth planning the roof demolition together with the roof renovation.

Can a wall be removed to create an open-plan living room and kitchen?

A partition wall, yes; a load-bearing wall only with a steel or reinforced-concrete lintel sized by a structural engineer. In prefabricated buildings most internal walls are load-bearing, so there a structural engineer's report and the apartment building's consent are essential; in an old brick apartment the main wall can also be opened up, but it may require a permit. At the on-site survey we tell you which wall is which, and we carry out the demolition and the lintel installation together, as one team.

What determines the price of demolition and rubble removal?

The material and quantity of the structures to be removed (tiling, plaster, partition walls, screed, services), the floor level and whether there is a lift (carrying down by hand from upper floors), the number of skips, the public-space fee and any hazardous waste (asbestos, tar). The demolition phase of a full apartment renovation in Budapest typically takes a few days, with 3–8 m³ of rubble per apartment. In the itemised cost estimate, demolition, the skip and the landfill fee are separate items.

When can noisy demolition work be carried out in an apartment building?

This is governed by the house rules and the district regulations: typically weekdays between 8 am and 6 pm, shorter hours on Saturdays, and not at all on Sundays and public holidays. We notify the building manager and the neighbours in advance, protect the stairwell and the lift with covers, and control dust with dust screens and daily cleaning. We concentrate the demolition at the start of the schedule, in one or two blocks, so that the noisy period is as short as possible.

Request a quote

Request a no-obligation quote

On-site survey, itemised cost estimate, fixed deadline and warranty – we reply within 1 business day.

  • Reply within 1 business day
  • Itemised cost estimate
  • Fixed price, fixed deadline, warranty
No obligationMon–Fri 8:00–18:00 · info@telehome.hu