
Period Apartment Renovation: Character & Comfort
Thick walls, high ceilings, original parquet – and plenty of challenges. This is how a period apartment becomes a home with character that works in a contemporary way.
You do not simply walk into a period apartment – you arrive. Thick walls, high ceilings, original parquet, huge windows. Everything is there for character, and everything is there for a challenge too. The romance ends quickly, however, when the costs of the apartment renovation, the building services, the insulation or the question of a complete kitchen renovation come up. A space like this does not ask for half-measures but for a well thought-out, comprehensive renovation.
Apartment renovation costs, window replacement and insulation
Planning the costs is always a different dimension in a period apartment. The old windows and doors are often beautiful but weak in terms of thermal insulation, so window replacement is unavoidable in many cases. Because of restrictions on the external facade, often only internal insulation is an option, which requires separate design. The right insulation is not only an energy question but a matter of comfort as well.
The same is true of cooling: a well-chosen air conditioner only becomes a real solution together with its installation. In spaces like these, fitting air conditioning is not purely a technical task but an aesthetic challenge too, as the units must not dominate the view.

Kitchen renovation and creating a modern kitchen
A kitchen renovation in a period apartment is not a simple change of tiles but an interpretation of the space. Should the kitchen stay separate, or should we open it up towards an elegant open-plan kitchen? A well-designed modern kitchen does not take away from the classic atmosphere – it adds a new layer to it.
Choosing the right kitchen tiles, for example, defines the rhythm of the whole space. The material of the kitchen worktop – whether stone, quartz or solid wood – is a long-term decision. A quality kitchen tap and a well-placed kitchen light raise the standard with fine details. Of the many kitchen ideas, the ones that really work are those that take the ceiling height and the proportions into account, not just the trends.

Living room, living room furniture and smart home system
The living room used to be a reception room; today it is the centre of life. In a space this large, the biggest mistake is undersizing. Living room furniture that is too small, lighting that is too weak, poor proportions.
The right solution is a combination of layered ceiling lighting, discreet floor lighting and consciously chosen living room ideas. Meanwhile, an up-to-date smart home system can be fitted into the space almost invisibly. Well thought-out smart home solutions do not take away from the historic atmosphere – they raise the level of comfort without being seen.

Parquet restoration, parquet sanding or laminate flooring?
One of the greatest assets of period apartments is the genuine, original wooden parquet. The first question: can it be saved?
If so, restoring the parquet is often a better decision than replacing it. Sanding and varnishing the parquet can give the surface a new life. If it is damaged, precise parquet repair can follow. If it is beyond saving, then comes the laying of new flooring – laminate, vinyl or SPC.
At this point many people are tempted by cheaper laminate flooring. But in a period apartment this can easily lead to a loss of character. The skirting board is an important detail too – it seems a small thing, but visually it frames the space. Parquet prices naturally cover a wide range, but here we are not merely choosing a floor covering – we are choosing an identity.

Bathroom waterproofing and bathroom lighting
In an old apartment, the most important hidden element is the bathroom waterproofing. If it is not right, the whole project is at risk. Modern waterproofing is not an option here but a basic requirement.
With high ceilings, the right bathroom lighting needs separate design. A single ceiling light is not enough here; it is the conscious layering of light that gives real quality.
Terrace, terrace shading and metalwork
If the apartment has a terrace, it is a real asset. Without well-designed terrace shading, however, it can easily become unusable in summer. Here, well thought-out terrace ideas do not mean decoration but function and liveability.
A project like this often needs an experienced metalworker as well. Bespoke railings, mezzanine structures and various metalwork jobs can give the space a subtle industrial character while providing structural safety.
The kitchen renovation, the window replacement, the right insulation, a system consciously designed together with the air conditioning installation, the elegant living room, the details of the bathroom and the carefully executed parquet restoration together make up the full picture. Renovating a period apartment is not about making it "look nice". It is about building a working present on the structure of the past – without compromises.
Request a no-obligation quote
On-site survey, itemised cost estimate, fixed deadline and warranty – we reply within 1 business day.
- Reply within 1 business day
- Itemised cost estimate
- Fixed price, fixed deadline, warranty
Related articles

Apartment Modernization: Windows, Heating, Hot Water and Insulation
Modernizing an apartment starts where painting ends: windows, heating, hot water and insulation. These decide your utility bills and how the home actually feels.
Read more →
Bathroom Renovation Step by Step: From Demolition to Painting
The bathroom is the densest room of any home: water, electricity, humidity and tiling meet on a few square metres. Its renovation tolerates no improvisation – from demolition to painting, every step works for the next one.
Read more →
Partial Apartment Renovation: What It Includes and the Right Order of Work
Not every apartment needs a full renovation. If the plumbing and wiring are in good shape, a well-planned partial renovation – new flooring, interior doors, fresh paint, new fixtures, even a complete bathroom – can give you…
Read more →