
The 20 Worst Renovation Mistakes
Bathroom, kitchen, drywall, laminate flooring, air conditioning: the twenty pits most renovations fall into – and how to avoid them.
Renovating a flat always starts with “Right, now things will finally be in order.” Then three days later you are standing in the middle of the living room, covered in dust up to your waist, holding a spirit level that has slipped out of true, as you realise: this is a much bigger job than you thought. And no, not because you are not handy enough, but because apartment renovation is full of pitfalls that only someone who has been in it for years can see through. That is exactly why TeleHome was created: so that you do not fall into the same twenty pits that 90% of Hungarians step into.
Bathroom renovation – the place where mistakes do not ask permission, they just turn up
Bathroom renovation is the territory where there is no room for being clever. Water does not joke. And a “cheap bathroom renovation” usually ends with brown stains appearing on the ceiling, the neighbour knocking on the door, and you suddenly hating every trade. TeleHome does not play small here: proper waterproofing, proper pipework, proper installation, because what water has once ruined cannot be put right with kind words.

How much does a bathroom renovation cost? – the maths that hits many people in the face
The question is fair: how much does a bathroom renovation cost? The answer, however, is rarely what you expect. The “200-thousand-forint renovations” you see online are like fitness adverts: they sound good from a distance, but reality is a good deal broader. Demolition, plumbing, electrical work, bathroom tiles, tiling – these are what eat up the budget. TeleHome prepares every project item by item and tells you right at the start what costs how much, why it costs that much, and where you can save cleverly rather than foolishly.
Tiles – one bad decision and your home looks at you reproachfully for years
A tile in itself is harmless. It only becomes every renovator's worst enemy when it is badly chosen. It looks lovely in the shop, it looks lovely on Pinterest, then it meets the steam of the kitchen or the humidity of the bathroom and suddenly gives up. TeleHome recommends tiles that not only look good but survive everything that can happen in a Hungarian home. And yes: that is worth far more than a good photo.
Kitchen renovation – the bonnet of the house, where there is no room for DIY
The kitchen is the territory where every mistake is multiplied by five. If the electrics, the oven, the sink or the services are in the wrong place, the kitchen renovation is dead from the start. A beautiful kitchen worktop will not in itself solve a bad layout, and a new kitchen tap will not make a faulty system work. TeleHome designs the kitchen the way a mechanic lays out his workshop: everything goes where it makes the most sense.

Kitchen tiles – where heat, grease and reality decide whether the choice was a good one
Kitchen tiles are one of the hardest-working surfaces in the flat. If you choose poor quality, it soon gives in to heat, grease and daily cleaning. Here too, TeleHome puts functionality first, because in the kitchen the real judge is not beauty but durability.
Drywall – a fortress in good hands, papier-mâché in bad ones
Drywall fools many people. Cheap, light, fast – then a few months later the first crack appears. The price of drywall does not tell you how good the work was. The framework, the fixings, the quality of the junctions – these decide whether the wall lives or dies. TeleHome's tradespeople build drywall you would even trust with a television. Because often you have to.
Laminate flooring – the mood of the space can depend on it, but only with a good choice
Laminate flooring can easily ruin the big dream if you choose it badly. If it is noisy underfoot, cold, easily damaged or not compatible with underfloor heating, the living room quickly goes from “warm home” to the “never again” category. TeleHome always recommends flooring based on real use, because flooring is not decoration but one of the most important surfaces in the home.

Living room and living room furniture – when the character of the space disappears because of a bad decision
The living room is the heart of the home, but in most flats it does not look like it. Living room furniture that is too big or too small, a bad layout, borrowed inspiration – and the mood of the space is gone. TeleHome prepares a 3D visualisation so that the living room is not only beautiful but liveable too. A space that is good to come home to after a long day.

Air conditioning – a lifesaver in the right place, a curse in the wrong one
Installing air conditioning is no game. If the airflow blows straight at you, the result is a draught, a sore throat, a nuisance. TeleHome installs every air conditioner after an on-site survey, because an air conditioner in the right place is worth its weight in gold, while one in the wrong place does more harm than good.
Home renovation – the project that works when everything is in one pair of hands
Home renovation fails when there is nobody to hold the trades together. One tradesperson is late, so the next cannot work, the third has no materials, and meanwhile time passes and the chaos grows. TeleHome thinks in systems: every trade, every process, every decision in one pair of hands. That is how chaos becomes order, and a dream becomes a real, liveable home.
Request a no-obligation quote
On-site survey, itemised cost estimate, fixed deadline and warranty – we reply within 1 business day.
- Reply within 1 business day
- Itemised cost estimate
- Fixed price, fixed deadline, warranty
Related articles

Apartment Modernization: Windows, Heating, Hot Water and Insulation
Modernizing an apartment starts where painting ends: windows, heating, hot water and insulation. These decide your utility bills and how the home actually feels.
Read more →
Bathroom Renovation Step by Step: From Demolition to Painting
The bathroom is the densest room of any home: water, electricity, humidity and tiling meet on a few square metres. Its renovation tolerates no improvisation – from demolition to painting, every step works for the next one.
Read more →
Partial Apartment Renovation: What It Includes and the Right Order of Work
Not every apartment needs a full renovation. If the plumbing and wiring are in good shape, a well-planned partial renovation – new flooring, interior doors, fresh paint, new fixtures, even a complete bathroom – can give you…
Read more →