Apartment Renovation Costs 2026: How Much?
Prices per square metre, labour and material costs, room-by-room costs and hidden items: realistic numbers for an apartment renovation in 2026.
In 2026 the cost of apartment renovation is on owners' minds more than ever before. Rising material prices, the shortage of tradespeople and inflation together determine how much a project costs. Whether it is a new kitchen, a well-thought-out living room or even a full modernisation, the final sum depends on many factors.
The areas often affected during a renovation include drywall installation, tiling and flooring, painting, and the various building services jobs, such as installing water, gas and heating systems. Even with a simpler project it is important to see the costs in advance.
Apartment renovation – Prices per square metre in 2026
The price of a renovation is most often given per square metre, but this depends heavily on the quality of the workmanship and the materials chosen.
- Basic renovation: approx. 120,000 – 200,000 Ft/m²
- Mid-range: 200,000 – 350,000 Ft/m²
- Premium finish: 350,000 – 600,000 Ft/m²+
Simply painting or plastering a room is far cheaper than, for example, a complete kitchen design or a luxury bathroom tiling job.

Labour and material costs
A significant part of the cost of a renovation is made up of labour and materials together. The work of an experienced joiner or metalworker is a serious item these days, especially when it comes to bespoke solutions, for example making a complete set of living room furniture or a bespoke living room wall unit. The situation is similar with building services work, where a good heating engineer or a complex heating upgrade can increase the costs significantly.
The choice of materials is at least as decisive. There can be huge differences between parquet prices, whether it is a classic solution or laying laminate, vinyl or SPC flooring. For the walls, building a drywall partition or using a special soundproof plasterboard also increases the final sum. With tiling, the choice of tiles, wall tiles and kitchen floor tiles is a key question in terms of both design and price.

Apartment renovation – Costs room by room
The cost of a renovation also depends significantly on which rooms the project involves. Fitting out a kitchen is usually one of the most expensive, since kitchen design, building services and bespoke furniture all come together here. A well-thought-out modern kitchen is important not only from an aesthetic point of view, it is also a long-term investment.
In the living room, most of the costs are related to the furnishings and the look. When creating a high-quality modern living room, the right living room wall, various living room ideas, and the flooring – for example choosing parquet or the right parquet laying technique – often come to the fore.
Bathroom renovation is a category of its own, where bathroom tiles, waterproofing and building services work all arise together. A well-chosen bathroom cabinet is not only practical but also plays an aesthetic role.
In the bedroom the emphasis is more on comfort, where the right bedroom furniture, a good-quality window, or even a soundproof door ensures a peaceful environment.

Hidden costs
One of the biggest challenges of a renovation is the appearance of unplanned expenses. It often happens that only after demolition does it turn out that additional masonry work is needed, or that the existing structure is not in a suitable condition. Building a drywall partition is in many cases added to the project only afterwards, when the real conditions become visible.
Surprises can arise with tiling and flooring too, for example when the existing surface is not suitable for receiving the new covering, so extra preparation is needed. The same is true of floors, where a parquet repair or a complete parquet restoration may become necessary.
More and more people are also thinking about installing a smart home system, which, if it is not planned in advance, is much more costly to build in afterwards.
Is it worth renovating in 2026?
The answer is yes, but only if the planning is done deliberately. Choosing the right tradespeople – whether for joinery, metalwork or even a complex build – is key. It is worth thinking through the details as early as the design phase, for example choosing the kitchen ideas or the right paint colours.
A well-planned renovation not only brings an aesthetic improvement, it also significantly increases the value of the property.
Apartment renovation in 2026 is a serious investment where every decision counts. The right materials, such as the tiles, the parquet or the solutions chosen for the various surfaces, determine the result in the long term. If the process is well thought out and well organised, the end result will be not only beautiful but also lasting.
Request a no-obligation quote
On-site survey, itemised cost estimate, fixed deadline and warranty – we reply within 1 business day.
- Reply within 1 business day
- Itemised cost estimate
- Fixed price, fixed deadline, warranty
Related articles

Apartment Modernization: Windows, Heating, Hot Water and Insulation
Modernizing an apartment starts where painting ends: windows, heating, hot water and insulation. These decide your utility bills and how the home actually feels.
Read more →
Bathroom Renovation Step by Step: From Demolition to Painting
The bathroom is the densest room of any home: water, electricity, humidity and tiling meet on a few square metres. Its renovation tolerates no improvisation – from demolition to painting, every step works for the next one.
Read more →
Partial Apartment Renovation: What It Includes and the Right Order of Work
Not every apartment needs a full renovation. If the plumbing and wiring are in good shape, a well-planned partial renovation – new flooring, interior doors, fresh paint, new fixtures, even a complete bathroom – can give you…
Read more →