Home Renovation
Renovation – overviewApartment renovationHouse renovationShop, office, restaurant
House building
House building – overviewBrick / YTONG houseSIP panel house
References About Blog Client portal Request a quote +36 30 366 0936

info@telehome.hu · 20+ years of professional background

Choosing a Renovation Company in Budapest: 12 Questions Before You Sign
Apartment renovation

Choosing a Renovation Company in Budapest: 12 Questions Before You Sign

The cheapest quote is rarely the cheapest renovation. Twelve questions worth putting to every apartment renovation company before you sign the contract.

Finding a contractor in Budapest today is easy. Finding a good one is hard. The adverts all say the same thing: "quality work, fast completion, fair price". The difference does not show on the website. It shows in how a company answers a few simple but uncomfortable questions.

The list below comes from experience of where renovation projects break down. It is rarely the workmanship. Far more often it is unclear technical content, the payment schedule and a lack of responsibility.

Key takeaways

  • Ask for an itemised cost estimate, not a "price per square metre" guess. It is the basis of the contract.
  • The contract should state the deadline, the payment schedule and the length of the warranty.
  • Ask who will actually be working in the apartment and who is responsible for coordinating the trades.
  • The deposit and the instalments should follow the completed work, not the calendar.
  • Ask for real references you can visit and company details you can check.

Quote and cost estimate: this is where most of it is decided

1. Will I get an itemised cost estimate or a flat rate?

A flat rate ("net X Ft/m², everything included") looks convenient, but it does not tell you what is included. An itemised cost estimate shows the work, the quantity and the unit price line by line. That lets you compare quotes and, later on, see what has changed.

2. What is not included in the price?

This is the most important question and the one asked least often. Rubble removal, moving materials, protective sheeting, fittings, liaising with the building manager, cleaning: if these are left out, they turn up at the end as extra work.

3. Is the quote based on a site survey?

You can estimate over the phone or from photos, but you cannot price that way. In an old Budapest apartment the condition of the walls, the subfloor and the wiring only becomes clear on site. That is why an on-site condition survey is not a formality.

4. How do you handle extra work?

The good answer: every change is agreed in writing and priced in advance, and is carried out only after you have approved it. The bad answer: "we'll see as we go".

Contract, deadline, payment

5. What goes into the contract?

As a minimum: the technical content (the cost estimate as an appendix), the start and handover dates, the payment schedule, the length of the warranty and the consequences of delay. If any of these is missing, ask for it.

6. How large is the deposit, and what are the instalments tied to?

The deposit typically covers the purchase of materials. Further instalments are healthy when they are tied to a completed work phase (demolition, plumbing and heating, tiling) rather than to a date.

7. Who buys the materials, and who is responsible for them?

If the contractor buys them, the contractor is responsible for the quantities and the delivery dates. If you do, the risk of delay is yours as well. Either can work, as long as it is written down.

Team and responsibility

8. Who will actually be working in the apartment?

An in-house team or casual subcontractors? A subcontractor is not a problem if the company manages them and takes responsibility for them. The problem is when the client has to work out who is at fault.

9. Who is my contact, and who coordinates the trades?

An apartment renovation involves 6–10 trades. If nobody coordinates them, the electrician waits for the bricklayer and the tiler waits for the plumber. This is what general contracting solves.

10. How will I be kept informed of progress?

Photo documentation, a weekly meeting, written communication. The point is that not everything should happen over the phone and from memory.

References and warranty

11. Can I see a real, earlier job?

A catalogue photo can come from anywhere. Ask for a reference where the client can be contacted too, or look at the company's references and Google reviews.

12. What does the warranty cover, for how long, and who does the repairs?

A warranty is worth something if it is written down and if the company can still be reached five years from now. Besides the company name, tax number and registered office, also ask whether it holds a Complaint-Free Construction Certificate.

Quick filter: good answers and suspicious ones

QuestionReassuring answerWarning sign
Cost estimateItemised, with quantities, after a surveyA single figure, "approx.", over the phone
Extra workIn writing, priced in advance"We'll find out as we go"
DepositTied to materials, the rest phase by phaseA large sum up front, before any work
ContractDeadline, schedule and warranty included"Why bother with paperwork, you can trust us"
ResponsibilityOne contact person, one responsible company"The electrician is separate, talk to him"
InvoiceA proper company invoice for every itemCash, cheaper without an invoice

A good contractor is not one with whom nothing unexpected ever comes up. It is one who tells you in advance what may come up, and what happens if it does.

How does TeleHome work?

With us every apartment renovation starts with a survey in person, which becomes an itemised cost estimate attached to the contract as an appendix. We fix the deadline in the contract, one project manager coordinates the trades, and you can follow progress with photos on our own client portal. If you would like these answers for your own apartment, request a no-obligation quote.

Frequently asked questions

How many quotes should I ask for when renovating an apartment?

Usually 2–3 itemised quotes are enough. Ask for more only if the first two differ widely; in that case it is worth going through them line by line to see what is missing from each.

Why is one quote more expensive than another for the same apartment?

Most often because the technical content is different: one includes rewiring, floor levelling or rubble removal and the other does not. With an itemised cost estimate you can see this line by line.

What should I look for in a renovation contract?

The technical content (the attached cost estimate), the start and handover dates, payment tied to work phases, a written procedure for extra work and the length of the warranty.

Request a quote

Request a no-obligation quote

On-site survey, itemised cost estimate, fixed deadline and warranty – we reply within 1 business day.

  • Reply within 1 business day
  • Itemised cost estimate
  • Fixed price, fixed deadline, warranty
No obligationMon–Fri 8:00–18:00 · info@telehome.hu