
Guaranteed Reliability in Renovation
Fraudsters and professionals, cheap and expensive: a short summary of the apartment renovation market and of how we guarantee reliability.
We give a short summary of the current apartment renovation market, covering the following:
- What is the current situation? (fraudsters and professionals, cheap and expensive)
- How does it work with us? (processes, contract)
What is the current situation?
Reliability plays a particularly important role in the construction industry, especially at present. More and more unreliable "contractors" have appeared in the sector in recent years, and this has been even more noticeable over the past year.
We do not deny that we, too, have come across work that was left incomplete or carried out unprofessionally, but thanks to that past we now know who to work with. This has a major influence on the quality and organisation we provide. That is why we confidently take on every kind of construction work.
These "tradesmen" have a few main characteristics. The most typical traits are that they can usually start work the same day, or the next day at the latest, yet they cannot give a written, itemised quote. They also ask for almost the entire contract fee as an advance payment. On top of that, they are not willing to draw up a contract, and if they do, it is thoroughly incomplete. It is also important to know that in these cases there is no point in expecting an invoice. Unfortunately they never finish the work and they will never provide warranty repairs.
Sadly, many clients fall into this trap and hire the crews described above because of the tempting, lower price. It is very important for everyone to understand that this low price achieves nothing except that the work will later have to be put right professionally for twice as much. After a botched job, someone else has to strip out the previous crew's "work", repair it and then finish everything properly. This way we generate extra costs for ourselves. The only solution is to pay for the labour and expertise of experienced professionals. Even so, an apartment renovation still works out cheaper than with the first option.
How does it work with us?
With us, special attention is paid to the preliminary surveys, the consultations and the signing of the contract. With these, everything is clarified in advance, so the renovation runs undisturbed for its entire duration.
After the survey we always prepare an itemised cost estimate, which sets out the work processes broken down into units, for both materials and labour. This always becomes Annex 1 of the contract, so we can work to a budget fixed in advance, with no hidden costs. If additional work nevertheless arises along the way, it is settled on the basis of the hourly rates stated in the cost estimate. Of course, extra work may also arise if the client has additional requests in the meantime.
The contract specifies both the start date and the completion date. A minimal delay can occur at any time, so a late-delivery penalty is also included to cover any expenses the client may incur and to compensate for the inconvenience caused. If the work falls through, whether on the contractor's or the client's side, the cancellation penalty laid down in the contract comes into effect.
The payment schedule is also fixed in advance. We usually apply an advance of 20–30 per cent, payable by the day work starts. In addition, depending on the size of the job, there are further interim invoices and a final invoice. The interim invoices are usually issued at 60 and 90 per cent completion, and the remaining amount follows at the final handover, in the form of a final invoice. Before issuing any invoice we always prepare a certificate of completion, by which the client also accepts the partial completion laid down in the contract and takes over the work finished up to that point. This way both parties can feel completely secure.
We believe that these are conditions which are essential in an apartment renovation, and everyone should pay attention to details like these. If you choose us, you will go through the entire renovation in safety, and later you will also be able to claim any warranty repairs that may arise.
Apartment renovation without disruption! Yes, it is possible!
Request a no-obligation quote
On-site survey, itemised cost estimate, fixed deadline and warranty – we reply within 1 business day.
- Reply within 1 business day
- Itemised cost estimate
- Fixed price, fixed deadline, warranty
Related articles

Apartment Modernization: Windows, Heating, Hot Water and Insulation
Modernizing an apartment starts where painting ends: windows, heating, hot water and insulation. These decide your utility bills and how the home actually feels.
Read more →
Bathroom Renovation Step by Step: From Demolition to Painting
The bathroom is the densest room of any home: water, electricity, humidity and tiling meet on a few square metres. Its renovation tolerates no improvisation – from demolition to painting, every step works for the next one.
Read more →
Partial Apartment Renovation: What It Includes and the Right Order of Work
Not every apartment needs a full renovation. If the plumbing and wiring are in good shape, a well-planned partial renovation – new flooring, interior doors, fresh paint, new fixtures, even a complete bathroom – can give you…
Read more →