Apartment Renovation FAQ
Apartment renovation

Apartment Renovation FAQ

We have collected the most common questions about the renovation process, the quote, payment and the guarantee – and answered them.

We have collected the questions we are asked most often about apartment renovation and its process, and have tried to answer them as fully as possible.

What is the first step?

The first step is always to prepare the cost estimate for the renovation; this requires a survey, which can be done in two ways – you can read about it by clicking HERE. Once the quote has been accepted, the contract is signed, and we have written about this in more detail too – you can reach it by clicking HERE.

What does the quote include?

In every quote – the so-called cost estimate – we list the work to be done item by item, in terms of both materials and labour. From this the total cost of the renovation can be calculated with almost 100 per cent accuracy. However, there can be unclear questions about what is and is not included on the materials side. To prevent this problem, we always agree in advance what the client buys and what we provide. Most often we price only the auxiliary materials in the quote, and where needed also external and internal doors and windows, soft flooring and certain building services equipment. We very rarely supply fittings, sanitaryware and tiles, since a million kinds exist, so the client can choose what suits them best. Of course, we can help with these too.

When can you start?

We can usually schedule the start of the apartment renovation in question 1–4 weeks after the order. We have numerous subcontractors as well as our own workforce, so we can provide the demolition, electrical and building services work needed for the start almost immediately.

How long does the renovation take?

This varies a great deal. A freshen-up repaint can be done in just a few days, a complete bathroom renovation can be finished in 2–3 weeks, but a complex renovation can easily reach 4–5 weeks. Not to mention the materials that have to be ordered: for some internal doors you may have to wait up to 8 weeks, and the same goes for bespoke furniture. The contract always sets the start and completion dates of the apartment renovation.

What do I – as the client – have to buy?

We help throughout with this too – with sourcing the sanitaryware, fittings and tiles needed for the apartment renovation. Before the renovation we put together the quantities, the types and the dates: what has to be bought and by when.

What happens to the waste produced?

An apartment renovation produces a significant amount of waste, and this needs particular attention. By default we price the removal of the waste produced during demolition and construction in the cost estimate. Depending on access, this is done with a suitable skip or by removal in rubble sacks.

Can you help with applying for a state subsidy?

Of course – we properly prepare and collect every part that concerns us. At the end of the renovation we hand over the documents together, and they only need to be submitted. What belongs here: the contractor agreement, invoices and the invoice summary. The remaining personal documents are, naturally, for the client to arrange themselves.

What happens if the deadline slips?

Delays can occur anywhere, caused by any kind of factor. If extra or additional work becomes necessary, that obviously affects the deadline too, and extending the deadline is accepted. If the delay occurs for other reasons not related to the renovation, the penalty set out in the contract is applied. This is usually defined as a percentage of the total contract fee, broken down weekly or daily.

When do I have to pay?

With us the payment schedule is always tailored to the client. It is influenced mostly by the size of the renovation. The most typical is a 30% advance, then 60% completion, 90% completion and the final 100% completion. The 60 and 90 per cent stages always fall due when a part of the work is finished. At that point the client accepts the work on the basis of a completion certificate, which is the condition for invoicing.

What does the guarantee cover?

The guarantee covers any defect that arises and was not caused by improper use. We repair defects under guarantee within the guarantee period set out in the contract; this must be reported in writing in advance, and we repair the identified problem at a pre-arranged time.

If you have further questions that have not been answered, please contact us by clicking the button below.

Request a quote

Request a no-obligation quote

On-site survey, itemised cost estimate, fixed deadline and warranty – we reply within 1 business day.

  • Reply within 1 business day
  • Itemised cost estimate
  • Fixed price, fixed deadline, warranty
No obligationMon–Fri 8:00–18:00 · info@telehome.hu